Open letter from Hasiru Usiru on draft BMLTA act

Dear Shri Mohsin avare,

This is regarding the Draft of the Bangalore Metropolitan Land Transport Authority Act. I am writing to you on behalf of the Hasiru Usiru network.

We would like to commend the DULT for moving to create a unified transport authority. The creation of such an authority is a real need right now. We would also like to commend you for pro-actively arranging a public consultation to discuss the same.

To ensure that the act is people friendly and so that people get a genuine chance to shape this act, we would like to request you to –

1)Grant more time for the public to review and respond .
We feel this extension is essential because this is the first time such an authority is being created for Bangalore and it is important that this act and its implications are reviewed thoroughly. This act covers not juts BBMP areas but the whole of the Bangalore Metropolitan region. There has been very little effort at seeing the mobility of this whole region together earlier and since this is a first effort, this must be carefully reviewed.

We would like the deadline to be extended till March 15, 2010.

2)Provide printed copies of the act in Kannada
English is not accessible by many people in the Bangalore Metropolitan Region and it is imperative that any new law or act needs to be made available in Kannada . Till such time this copy is provided, please do not close the window for feedback.

3)Arrange for statutory public consultations in all the impacted areas
Since this act impacts the mobility needs and city development of 19 ULBs (including BBMP), 338 Gram Panchayats 12 Taluk
Panchayats, 2 Zilla Panchayats, people in all these areas must get a chance to review the act and provide feedback.

4)Ensure that public consultations have the participation of elected representatives
This includes the MLAs of Bangalore district and all the elected representatives of the impacted local bodies(urban and rural). All impacted local bodies must discuss this act too and provide their feedback. Since this also impacts BBMP areas greatly, it would be essential that an elected BBMP council discusses this act and passes on its feedback too.

5)Ensure that the act is finalised only after the steps 1 to 4 mentioned above are undertaken – extension of timeline, translation into Kannada, required public consultations and discussions with elected representatives need to happen before the act is finalised.

Request you to please respond favourably to our demands.

Thanks,
Vinay Sreenivasa,
on behalf of Hasiru Usiru

Comments:

  1. Vinay Sreenivasa says:

    thanks for sharing Deepa. We have not yet heard back from them but are hopeful that th date will be pushed back. its too little time to respond for such an important act!

  2. Vaishnavi Vittal says:

    The Public consultation workshop on Bangalore Metropolitan Land Transport Authority Act (Bangalore Metropolitan Land Transport Authority) which was scheduled to be held on February 20th 2010 is postponed to March 3rd 2010.

    Venue: Institute of Town Planner, Bangalore, India at 3 PM. The draft act is also published in the website of Bangalore Metropolitan Land Transport Authority (BMLTA) and Directorate of Urban Land Transport (DULT) (www.bmlta.org, http://www.urbantransport.kar.gov.in) for general public opinion till date.

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Music, play, and community action help residents protect and celebrate Mumbai’s parks

Citizens are reclaiming their parks with LYPMumbai, an initiative that encourages the better use of open spaces through art and music.

They paved paradise and put up a parking lot/ With a pink hotel, a boutique, and a swinging hot spot. These words of the Joni Mitchell classic Big Yellow Taxi filled a corner of Pushpa Narsee Park in Juhu on a bright Sunday morning in March. Though the song was released in 1970, the words resonate in 2026, especially for this park. There have been several attempts to convert Pushpa Narsee Park into a parking lot, only foiled by the vigilance of the locals, says Anca Florescu Abraham, co-founder of Love Your Parks Mumbai (LYPMumbai). This initiative advocates for the…

Similar Story

Uthandi’s ₹91-crore ‘flood drain’: Is Chennai solving one problem by creating another?

The WRD's flood fix puts Uthandi at risk. Residents flag pollution, CRZ violations, aquifer damage, and threats to nearby fishing livelihoods.

The Straight-cut Flood Escape Channel project at Uthandi in the southern part of Chennai along East Coast Road was conceived by the Water Resources Department (WRD) as a flood mitigation measure, with a budget of ₹91 crores. The plan proposes a cut-and-cover drain through the VGP Layout in Uthandi, to connect the Buckingham Canal to the Bay of Bengal. The drain is supposedly meant to divert excess floodwater in Buckingham Canal during heavy rains, when areas around the Pallikaranai marsh and Okkiyam Madavu face flooding.  Work on the project started immediately after its inauguration in August 2025. However, residents of…