More progress on Harlur Road park

From June, work has been going on.

First the BBMP workers started clearing the front portion. Some sections of the plot have been left empty. One portion is apparently meant for a BBMP centre. The federation has asked for a water recharge pond at the back. Here is the status as of June end.

Harlur Park, Jun 2010

Here is the update from July end. Pathways have been laid out, red soil filled in. The borewell looks ready. (Should they be using borewell/drinking water for watering plants?). The children’s play equipment has been moved here. 

Harlur Park, Jul 2010

Latest news: some ornamental plants have arrived. The light poles have been fixed. Where is the entrance gate supposed to be? Will a portion of the fence be removed and converted to a gate?

And don’t miss the usual 9 am traffic jam, with vehicles blocking both lanes. If and when the road gets widened to four lanes, there will be more lanes to block. Yeah.

Harlur Park, Aug 2010

⊕

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Blocked Kovalam-Nemmeli wetland channels risk disaster for South Chennai; Conservationists urge action  

Barriers built for the Mamallan Reservoir block Buckingham Canal water flow, vital to keep the wetland alive, avoid floods and sustain fishing families.

In Chengalpattu district, the main water channels of the Kovalam-Nemmeli coastal wetland, which drains a catchment of more than 270 square kilometres, have currently been blocked. Barriers that obstruct water flow have been built across Chennai's Buckingham Canal at three places: Thiruvidanthai-Vadanemmeli, near the Nemmeli-Thiruporur bridge, and Saluvankuppam. Earlier, we explored how the Mamallan Reservoir causes serious damage to the wetland’s ecology and how fishing livelihoods are affected. Field investigations by the Wetland Conservation Network have recorded the blockages preventing tidal exchange in the Buckingham Canal.           According to officials, these barriers were put up to enable construction of the Mamallan…

Similar Story

Explained: How Mumbai is losing its tree cover to infrastructure projects

Mumbai's landscape is changing with big infra projects. Experts suggest better use of government plots and improved street design to retain green cover.

Long before Mumbai’s relentless summer even began this year, the city was already simmering. In March, Mumbai was hit by a severe heatwave, with the temperature reaching a five-year high of 40° Celsius. As rapid urbanisation and a flurry of infrastructure projects replace dense tree cover with steel and mortar, heatwaves seem to have gone from being rare occurrences to an annual threat.   The Mumbai Metro Rail Corporation Limited (MMRCL) cut a whopping 3,093 trees in Aarey Colony to make way for Mumbai’s Aqua Line ( Metro 3). For environmentalist Stalin Dayanand, this is not just a temporary problem.…