Digging up the roads….

At least this dug up part of Bannerghatta Road mentions that natural gas pipelines are being laid.

IMG_1959

 

But in most places, roads are dug up without warning and with no information about why the surface is being broken up. Nor does the road get any re-surfacing once the digging has been covered up, resulting in bumpy, muddy paths rather than the roads that we are paying taxes for.

When is the BBMP going to be accountable for the damage they cause, without reparation?

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Sion overbridge: Work in progress or a project stalled?

The delay in reconstructing one of Mumbai's iconic bridges is inconveniencing commuters. Residents hope the project will be completed soon.

On August 1, 2024, the Sion overbridge was closed for a two-year reconstruction project, disrupting traffic and daily commutes. The plan is to rebuild the century-old bridge — originally constructed across the railway tracks in 1912 — through a collaboration between the Central Railway and the BMC. However, to the dismay of citizens, the bridge has yet to be demolished. What are the reasons for this delay? Inconvenience to commuters The bridge connecting Sion East to Sion West serves as a vital link between Lal Bahadur Shastri (LBS) Marg, Dharavi, the Bandra Kurla Complex (BKC), and the Eastern Express Highway.…

Similar Story

BEST no longer: How contract buses are hampering services in Mumbai

Wet-leased buses, far outnumbering BEST’s own fleet now, are bogged down by multiple problems as contractors try to cut costs.

In Part 1 of this series, we discussed how BEST’s wet-leased buses — owned and operated by private contractors — are rapidly replacing its own fleet. In Part 2, we explore how this model is impacting the quality of bus services.Last December, nine people were killed and another 37 injured in an accident involving a wet-leased electric bus in Kurla. According to the police, the driver had not been adequately trained before being moved to an automatic electric bus from manual, geared buses. Under the wet-leasing model, introduced to cut BEST’s costs, a contractor owns and operates the bus, and…