BJP Government was partial in releasing funds, says Congress MLA

In an interview to Citizen Matters, veteran Congress leader and five-time MLA Ramalinga Reddy describes the problems of his constituency and his plans for the constituency.

Five-time MLA Ramalinga Reddy, now representing the BTM assembly was busy campaigning in Pothulappa Garden of Lakkasandra ward. Reddy visited an ailing supporter at his house after which he offered prayers to the local deity and then sat down for a chat with Citizen Matters during a campaign. As his supporters sang his praises in the background, Reddy talked about his constituency and his work in the last five years.

Ramalinga Reddy Pic: Sriram V

Here are the excerpts from the interview: 

Note: This website will soon be migrated to a new system.  If you face any issues, do mail us. You can also reach us through Twitter or Facebook!

Bengaluru This Week

Get our free weekly newsletter.

What are the main problems of the constituency?

Apart Koramangala and 50 % BTM, most of the areas that come under BTM constituency fall under revenue pockets. So the development in the area has been haphazard with most of the areas having narrow roads. In the recent years some of the areas have been facing a shortage of water and since there are a lot of high rises in the area there are some problems with the sanitary system as well.

What are your achievements as the MLA?

In some of the new areas added to the BBMP, the state of the roads was pretty bad.

I have ensured that most of the narrow roads are converted into concrete roads. Most of the areas had tube light for street lights they have all been converted to sodium vapor lamps. We got a BMTC bus station completed in Koramangala and there is a proposal for the construction of another in BTM Layout. Houses for the poor have also been constructed under JNNURM schemes in Rajendra Nagar and Bovi colony. Work has already started on the construction of a new library in BTM.

How much funds you were able to mobilise for development work in the constituency?

Apart from the LAD fund, the first two years we were able to get about Rs 80 to Rs 90 crores. But once the BJP got control of the BBMP the funds dried up. Whatever work has been done is of a quality. When estimates of the BBMP works worth Rs 3000 crores were cancelled only works in our constituency were found genuine.

Do you have any regrets or unfinished work in your constituency?

Most of the work is done but at some places the water supply problems have to be sorted out. We have tried our best and have carried on works to ease the problem but still more work needs to be done. Water here has no pressure because that was being given to 100 wards before is now being supplied to 198 wards. The sanitary lines in some areas also need to be changed to bigger diameter pipelines.

What have you done to address the traffic problem in the constituency?

Traffic is another main problem. I have sent proposals asking for flyovers and underpasses at important junctions. But there is a shortage of funds with the BBMP and they are yet to pay the contractors for the previous work. The BJP government was also partial in releasing funds for works in this constituency. If our party comes to power we will ensure all those works will be completed. Flyovers at Sarjapur road and Sony World junction have been included in this year’s budget. We are also looking at ways of solving the traffic problem at Udupi Garden junction as building a flyover there will move the congestion to the next signal.

What is your opinion on the policy of giving out G category sites?

It is a policy matter. I will go by whatever my party decides on the issue. But personally I’m not against it.

Why should people vote for you again?

People should vote for me because I’m easily accessible to them. I might not be able to get all the work done but I do whatever I can to solve their problems.

With that note, Reddy was done with the interview and got up to address his waiting supporters.

Comments:

  1. Muralidhar Rao says:

    Is he aware of the problems caused by the parking of the buses overnight on the roads, resulting out of the bus station (TTMC) coming up at the location? Is he also aware that the huge complex is lying largely empty, even years after its commissioning, thus becoming an additional burden on the already over-burdened tax payer?

  2. Muralidhar Rao says:

    The emphasis is largely on building of fly-overs and underpasses, with no mention whatsoever of the poor state of the footpaths, and other pedestrian (non) – facilities – http://praja.in/en/blog/murali772/2013/04/28/residents-assessment-mr-ramalinga-reddy-cong-btm-layout-mla-09-13

  3. Balasubramanian A. says:

    I agree Mr Ramalinga Reddy is an active Legislator and available to all.
    I wish to remind our MLA that spending funds and throwing statistics do not have any relevance to development, unless the benefits reach the tax payer. Look at the condition of Sarjapura Road opposite to St. John’s Hospital & Medical College. This was dug-up unnecessarily months back, but not repaired still. If you take a walk on 80″ peripheral Road from Wipro park to Sony World junction, you will be hit by numerous electricity poles carrying transformers for private buildings. There is no proper foot path to walk. Koramangala, where I live for more than three decades do not have Direct Bus Service to many of other important localities and new townships. Even now we do not have direct service to Bangalore Cantonment Station.

  4. K Ravi says:

    Many new commercial, office space, including multi storied flats constructions etc. being allowed to come up are permitted to come up without any planning to public civic amenities. Parking spaces, congestion to traffic, public toilets and utilities and convenience to public who are expected to come to them are completely forgotten must be looked into and given credence over commercial venture before they are allowed to come up.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Conspicuous by absence in Mumbai election campaign: BMC elections

Delay in BMC elections hits the quality of everyday life in Mumbai. The fact that no political party is raising hell over this in their current campaigns speaks volumes.

In 2022, with the world just recovering from the COVID-19 pandemic, it didn’t seem extraordinary when elections to the richest civic body, Brihanmumbai Municipal Corporation (BMC) were postponed. Though the reasons for postponement were a case in the Supreme Court about OBC seats and an earlier delimitation exercise, any aberrations to the existing systems were acceptable in the backdrop of two ghastly COVID-19 waves and Omicron.  But decisions that seemed fine at that point have outlived the concession. In Mumbai, as the city prepares for the state assembly elections, the elephant in the room is actually the BMC elections. Not to…

Similar Story

MCAP: Initiated in 2022, how effective is plan to mitigate climate change in Mumbai?

The Mumbai Climate Action Plan (MCAP),launched in 2022, is a step in the right direction but its implementation leaves a lot to be desired.

Scorching heat waves, devastating floods, a yearly increase in temperature, high AQI levels, Mumbai has seen it all over the past few decades, with no sign that the vagaries of climate will let up anytime soon. If the island city is to weather the storm of climate change, it requires a concrete map to navigate the next couple of decades. The Mumbai Climate Action Plan (MCAP), created by the Brihanmumbai Municipal Corporation (BMC) with the World Resources Institute (WRI) as a knowledge partner, is such a map. In 2020, Mumbai became a part of the global C40 network, pledging  a…