Meet TR Baalu, MP-elect from Sriperumbudur

DMK's Principal Secretary TR Baalu has been elected to the Lok Sabha from Sriperumbudur constituency for the fifth time. He defeated PMK's A. Vaithilingam.

Sriperumbudur election results on May 23 saw the DMK’s TR Baalu emerge the winner. He beat his nearest rivals Vaithilingam A (PMK) and Sridhar M (MNM) with a comfortable margin.

Sriperumbudur is one of the largest parliamentary constituencies in Tamil Nadu. It is a manufacturing hub and is home to many automobile production units. Sriperumbudur parliamentary constituency consists of Maduravoyal, Ambattur, Alandur, Sriperumbudur(SC), Pallavaram and Tambaram assembly constituencies.

According to the Election Commission of India’s website, the constituency has a total of  2253041 voters. The constituency went to polls on April 18, 2019, in the second phase of the 17th Lok Sabha elections. Sriperumbudur registered 60.39% voter turnout.

S.No Candidate Name of Party Number of votes Vote share
1 TR Baalu DMK 793281 56.39
2 A Vaithilingam PMK 285326 20.28
3 M Sridhar MNM 135525 9.63

Source: ECI

Background

DMK’s Principal Secretary, T. R. Baalu has been elected five times to the Lok Sabha since 1996. He was first elected to Parliament as a member of Rajya Sabha in 1986. Baalu, who has served as a minister in H D Deve Gowda, I K Gujral, A B Vajpayee and Dr Manmohan Singh governments, had held various portfolios including the high-profile highways and shipping ministries.

Website: www.trbaalu.in

Facebook: https://www.facebook.com/TRBaalu/

Number of Criminal Cases: None

More details can be found here in the affidavit filed with the Election Commission.

Financial details of the candidate

Movable Assets Rs 1,39,39,461(self)+Rs 97,52,985 (spouse)
Immovable Assets Rs 951.14 lakhs (Self) + Rs 900.00 lakhs (spouse)
Liabilities Nil

Source: ECI  

Promises for the constituency

The election manifesto of TR Baalu.

TR Baalu has promised to take necessary efforts to boost the industrial growth in the constituency and to provide a wide range of employment opportunities in the country with special focus on Tamil Nadu. “I can assure you that local issues will be addressed effectively by me, to the fullest satisfaction of the people of the constituency,” said TR Baalu.

Baalu also promised to take necessary actions in the next five years to complete the Sethusamudram Shipping Canal Project, which he described as “the dream of Tamil people for the past 150 years”. He also promised to control traffic issues which people have been facing for a very long period of time.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Mumbai Buzz: Two die in a manhole accident | Metro 3 trials begin and more…

Other news in Mumbai: Two children suffocate to death in abandoned car; Bombay HC rap for demolishing galas; Leopard captured at Vasai.

Two die, third critical after falling into manhole Mumbai continues to see tragic accidents related to manual scavenging and deadly manholes. Two people died and a third is critical after falling into a 30-foot-deep manhole in Malad. The manhole was connected to a drain pipe on the site of a private under-construction building at Pimpripada in Malad east. Raju, who was a worker at the site, fell in and after that two nearby residents, Aqib and Javed jumped to save him. When none of them came out, the locals called the fire brigade to rescue them. According to the preliminary…

Similar Story

Chennai Buzz: RTE admissions begin | Anna Nagar to get new parking system… and more!

In other news from Chennai: GCC urges residents to pay property tax; Government plans to denotify a part of Pulicat bird sanctuary

TN government's plans to denotify a portion of Pulicat Bird Sanctuary raise concerns Thirteen revenue villages were included within Pulicat Bird Sanctuary boundary limits in 1980. The state government has now begun rationalising its boundaries raising concerns over the shrinking of the sanctuary’s eco-sensitive zone (ESZ). According to a news report, a proposal for the use of 215.83 hectares of non-forest land for the development of an industrial park inside the ESZ, and 5 km from the bird sanctuary was discussed during the 77th meeting of the Standing Committee of National Board for Wildlife held in January 2024. With the…