JP Nagar pedestrian pained

The footpath at the Kanakpura-Ring Road junction is neglected and unusable. JP Nagar resident T K Jagannathan is striving to get it repaired.

All footpath slabs uprooted. Sewage water over flowing on the road. Dozens of school children and IT employees have to wait beside this health and acident trap every morning. This is NH209!

There is a tussle between the BBMP and the Highways department ever since the Kanakapura road has scaled up as NH209.

My photograph of the problematic area was published in the Times of India on 18th December, 2008, followed by a mail to the chief minister, the commissioner of BBMP and the Director of National Highways Authority of India (NHAI) in Delhi.

If you would like to volunteer to help resolve this issue, please contact TK Jagannathan at 9880040101 .

The chief minister forwarded my mail to the chief secretary for his ‘action and reply’. There lies the matter.

Walking and crossing the signal to catch a bus or to shop is a nightmare for all, especially senior citizens.

All we ask is just repair the footpath. Is that too much?

kanakpura rd

Overflowing sewage on the footpath at Kanakpura Road (pic: T K Jagannathan)

Kanakpura rd cows

Footpath-turned-garbage dump at Kanakpura Road (pic: T K Jagannathan)

jp nagar

Broken slabs of the footpath at JP Nagar (pic: T K Jagannathan)

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Chennai’s ₹697 crore electric buses: Do they serve people who need it most?

While Chennai has invested crores in cleaner buses, public documents do not show if this deployment has improved mobility in high-density wards.

When Chief Minister M K Stalin flagged off Chennai's first batch of low-floor electric buses in June 2025, the programme was presented as a major step towards cleaner and more modern public transport. The first phase alone involves acquring 625 electric buses at a reported cost of ₹697 crore. The fleet includes 400 non-air-conditioned and 225 air-conditioned buses and is being operated from five depots: Vyasarpadi, Perumbakkam, Central, Tondiarpet-I and Poonamallee. The investment is substantial. Chennai has not inducted a fleet of this size in years. The buses are low-floor, wheelchair accessible and equipped with passenger information systems, CCTV cameras…

Similar Story

Riding the Chennai Metro is a breeze, but last-mile connectivity remains a worry

Chennai needs a unified transit system to ensure seamless travel for metro commuters on either side of the journey.

Stepping off the Thirumangalam metro at 6.45 pm, the train ride seemed effortless. It was cool, fast, and on time, taking just fifteen minutes from the office. Now comes the hard part. Standing at the station exit, finding a ride home is a struggle, as I switch between three apps to book an auto. The metro feeder bus only runs every 40 minutes and has just left. By the time I reach home, the "fast" metro trip has cost an extra half-hour and ₹120 in surge-priced rides, a last-mile problem the metro itself was built to solve. This is the…