What you can look forward to at the T Nagar pedestrian plaza

Work on the pedestrian plaza in Pondy Bazaar is set to be completed in a month. What can pedestrians expect to see? How will it affect traffic and parking in the area? Watch this video to find out.

The oft associated image of T Nagar’s Pondy Bazaar as a chaotic shopping hub where pedestrians jostle with vendors and navigate signboards (of shops) placed on the already cramped space of the footpath is all about to change. With the construction of a dedicated Pedestrian Plaza as part of the Chennai Smart City mission, the entire stretch is to get a makeover. 

The ambitious project aims to create a safe space for pedestrians and regulate traffic on Thyagaraya road. Apart from widening of the footpath, parking will also be revamped to a large extent. The completed pedestrian plaza is set to have seating areas, play elements for children, bike sharing and extensive green cover.

What are the various features designed as part of the plaza?

What changes can you expect after its completion?

This video will bring you details of all that is planned for the pedestrian plaza on Thyagaraya Road.

Comments:

  1. JAYARAMAN V S says:

    If the GCC can walk the talk, well, it will be great. But the GCC’s past records on the implementation and enforcement of its own rules are any guide, the pedestrian plaza will become a ‘parking plaza’. With vendors and hawkers competing with the existing commercial establishments to usurp the plaza, it will be plaza of different kind.

    • balasubramanian dhanasekaran says:

      What you have said is correct already pondy bazaar police station used to park their vehicles in the newly built pavements in front of their station.

  2. Skraj says:

    The reality will be footpaths occupied by hawkers,garbage 2 wheelers etc.,
    Hope police is strict from day 1

  3. Nagu says:

    When our police, Corporation officials and counsellors turn Nelson’s eye after being taken care of, how do you expect platforms to be available for pedestrians. The broad platforms will have shops/hawkers on either side fetching regular income to all these do called guardians of law at the cost of facilities meant for the pedestrians

  4. Sss says:

    Shops will slowly drop up as before.& after some years new shopping complex much bigger than presenr need to be constructed to accommodate occupants. The name itself pedestrian plaza for smart illegal occupants

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Mumbai Buzz: Two die in a manhole accident | Metro 3 trials begin and more…

Other news in Mumbai: Two children suffocate to death in abandoned car; Bombay HC rap for demolishing galas; Leopard captured at Vasai.

Two die, third critical after falling into manhole Mumbai continues to see tragic accidents related to manual scavenging and deadly manholes. Two people died and a third is critical after falling into a 30-foot-deep manhole in Malad. The manhole was connected to a drain pipe on the site of a private under-construction building at Pimpripada in Malad east. Raju, who was a worker at the site, fell in and after that two nearby residents, Aqib and Javed jumped to save him. When none of them came out, the locals called the fire brigade to rescue them. According to the preliminary…

Similar Story

Chennai Buzz: RTE admissions begin | Anna Nagar to get new parking system… and more!

In other news from Chennai: GCC urges residents to pay property tax; Government plans to denotify a part of Pulicat bird sanctuary

TN government's plans to denotify a portion of Pulicat Bird Sanctuary raise concerns Thirteen revenue villages were included within Pulicat Bird Sanctuary boundary limits in 1980. The state government has now begun rationalising its boundaries raising concerns over the shrinking of the sanctuary’s eco-sensitive zone (ESZ). According to a news report, a proposal for the use of 215.83 hectares of non-forest land for the development of an industrial park inside the ESZ, and 5 km from the bird sanctuary was discussed during the 77th meeting of the Standing Committee of National Board for Wildlife held in January 2024. With the…