City Buzz: Five things you must know about the Deonar WTE plant

Residents, activists, and lawyers are opposing this Brihanmumbai Municipal Corporation project, citing environmental and health concerns.

Waste-to-energy (WTE) plants are notorious for releasing harmful pollutants, and environmental activists have long criticised them as an unsuitable solution for legacy waste. Yet governments often view them as a quick fix for waste management and energy generation, despite their risks. It is no different with the WTE plant coming up at Deonar, the country’s largest dumping ground in the eastern suburbs of Mumbai.

The clamour against the project is growing louder as residents fear the toxic emissions from the WTE plant and the impact on their health. Here are five things you need to know about the project and why residents are opposing it.

About the WTE plant in Deonar

  • The 1,800-tonnes-per-day (TPD) plant is coming up at Deonar, a site in Govandi. It is spread over 8.2 hectares of land and will share its boundary with Mankhurd Shivaji Nagar, a densely populated area with lower-income groups.
  • It is being built by Chennai MSW Pvt. Ltd. at a cost of ₹2,648 crore and is expected to be ready by October 2025.
  • The plant will process 600 metric tonnes of waste daily, generating around 17 million units of electricity each year.

Local protests against the project

  • Residents, activists, and lawyers are protesting against this Brihanmumbai Municipal Corporation (BMC) project, citing environmental and health concerns.
  • The area houses around 200 informal settlements with over a million people living there. The residents are already affected by the pollution from the dumping ground.
  • Many have approached the National Green Tribunal (NGT), requesting that the project be stalled.

Environmental and transparency concerns

  • Activists argue that the project is being pushed without proper environmental studies or public consultation.
  • The land was originally meant for public welfare, but it is being turned into an industrial site.
  • The area has methane deposits and a history of fires, raising concerns about safety hazards.
  • A request has been filed under the Right to Information (RTI) Act for details about approvals and environmental assessments.
name board at Govandi railway station.
Residents of Govandi have long borne the brunt of toxic pollution from the Deonar dumping ground. Pic: Superfast1111, CC BY-SA 4.0/Wikimedia Commons
  • Advocate Abid Abbas Sayyed has challenged the Deonar project before various authorities, including the BMC Commissioner and pollution control boards.
  • He warns that burning mixed waste can release harmful toxins like dioxins, carbon monoxide, and sulphur oxides.
  • The law requires waste to be properly sorted before processing, but the plant may fail to do this.
  • In its defence, the MPCB claims it has conducted year-long studies before approval and will mitigate pollution with measures such as a 50-metre-high chimney and a scrubbing system to remove toxins.

Read More: Is the waste-to-energy plant in Deonar a good idea?


Unsuitability of mixed waste for energy production

  • The Deonar landfill has been collecting mixed waste for 50 years, including plastic, biomedical waste, and construction debris.
  • A Centre for Science and Environment’s 2018 report says that Indian municipal waste has high moisture and low calorific value. A WTE plant relying on incineration of mixed municipal waste is scientifically unsound and violates the principles under Article 21 and court judgements.
  • Air pollution from burning waste in Deonar could worsen health issues like asthma, tuberculosis and chronic obstructive pulmonary disease (COPD) in the already vulnerable population.

(Compiled by Revathi Siva Kumar)

Also read:

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Commuters, vendors bear the brunt of rising air pollution in Chennai’s Ambattur

IIT-M’s Project Kaatru finds high PM2.5 levels at Ambattur Estate, Padi flyover and Dairy Road, exposing residents to dust and pollution daily.

Commuters passing through Ambattur Industrial Estate inevitably find a layer of dust coating their vehicles, faces, and hands. For Lalitha*, a domestic worker employed at a high-rise apartment near Padi flyover’s Saravana Stores, the last two weeks of December have been especially unbearable. "Dust, dust, dust everywhere," she says, coughing through a persistent cold. At 6 pm, when the rush hour begins, it takes her nearly 30 minutes by bus to cover the 5 km journey home. The ride to the Dunlop area is punctuated by pollution, blaring horns, and endless traffic snarls. “It should take 15 minutes usually, but…

Similar Story

முதல்வர் சீக்கிரம் அடிக்கல் நாட்ட வேண்டும் என்பதற்காக அறிவியல்  ஆய்வுகளைப் புறந்தள்ளுவதா?

CRZ clearance has been granted for a new drinking water reservoir in the naturally formed coastal salt marshes in Chengalpattu near Chennai.

செங்கல்பட்டு மாவட்டம், திருப்போரூர் மற்றும் திருக்கழுக்குன்றம் வட்டங்களுக்குட்பட்ட வருவாய் கிராமங்களில், இயற்கையாக அமைந்துள்ள கழுவேலி, உப்பங்கழி நீர்நிலையில், புதிய குடிநீர் நீர்த்தேக்கம் அமைக்க CRZ அனுமதி வழங்கியுள்ளது மாநில கடற்கரை ஒழுங்குமுறை மண்டல ஆணையம். இத்திட்டத்தின் முதல் கட்டத்தில் நெம்மேலி, கிருஷ்ணகாரனை, தண்டலம், பட்டிபுலம், திருப்போரூர், மாமல்லபுரம், சலுவான்குப்பம், பையனூர் ஆகிய வருவாய் கிராமங்களுக்குட்பட்ட 4375 ஏக்கர் பரப்பளவில் வருவாய்த்துறை, நீர்வளத்துறைக்குச் சொந்தமான இடங்களில் நீர்த்தேக்கம் அமைக்கத் திட்டமிடப்பட்டுள்ளது. 1.655TMC கொள்ளளவு கொண்ட இந்நீர்த்தேக்கம் மேற்கூறிய கிராமங்களைச் சேர்ந்த 50 ஆயிரத்துக்கும் மேற்பட்ட மக்களின் குடிநீர்த் தேவையைப் பூர்த்தி செய்யும் எனவும் அருகாமை கிராமங்களின் வெள்ள பாதிப்பைக் குறைக்கும் எனவும் அரசுத் தரப்பில் கூறப்படுகிறது. Map showing components of the Kovalam reservoir. Pic courtesy: Tamil Nadu Water Resources Department. இத்திட்டத்திற்கான விண்ணப்பத்தை 17.11.2025 அன்று  தொழில் நுட்ப  வல்லுநர் குழு பரிசீலித்தது. 20.11.2025 அன்று  மாநில கடற்கரை  மண்டல ஆணையம் விண்ணப்பத்தைை பரிசீலித்து CRZ அனுமதிக்கு பரிந்துரைக்கிறது.…