Tracking C V Raman Nagar MLA S Raghu

S Raghu started his political career as a municipal corporator from the Bharatiya Janata Party (BJP) in 1996. He has won twice from his current constituency of C V Raman Nagar which is reserved under SC/ST category. Previously he represented the Shanthinagar constituency.

Some of Bengaluru’s most discussed land marks and civic problems fall under the C V Raman constituency. Public transport/connectivity to the high density Bagmane Tech Park; the cleaning up of the 45 acre Kaggadaspura Lake; portions of Indiranagar which are still reeling under rampant commercialisation are among a few noted ones. A lot of highly sensitive defence establishments are also in the area. Rampant real estate development which saw an increase of high rise buildings overlooking into their campuses compromising high security projects has been a cause of concern for these authorities.

S Raghu, who is the brother-in-law of Aravind Limbavalli, another city-based MLA, is a qualified engineer. Yet most of the problems in his area remain those which require engineering solutions. The changing political equations at the grass root level is also expected to be a factor in the elections – in 2013, all the seven wards in the assembly constituency had BJP corporators. This time, only three of them are from the BJP.

More info: Myneta profile for S Raghu

S Raghu in the Assembly:

S Raghu was a member of Committee on Sub-Ordinate Legislation.

  • Attendance % in Assembly: 46
  • Starred Questions: 0
  • Unstarred Questions: 0

(Source: Bengaluru Political Action Committee)

S Raghu in the news

April 29, 2013: Days prior to his re-election from the new C V Raman Nagar constituency, S Raghu promised to look into core problems such as traffic, garbage disposal, the revival of the Kaggadasapura lake and the construction of a hospital for diabetes.

September 1, 2015: BJP leaders including S Raghu were rude to the independent councillors invited to a BJP led BBMP meeting. He specifically remarked that the independent councillor from Konena Agarhara ward could not invited without his knowledge.

October 3, 2015: BBMP is not ready to take down posters advertising politicians on a bus shelter in Indiranagar despite orders from Urban District incharge minister Ramalinga Reddy. This particular one has MLA Raghu’s face plastered on it and he has not responded to the notice issued to him by the HC prior to the BBMP elections.  

Jan 7, 2015: He gave Rs 4 crores from his development fund for the revival of Kaggadasapura lake, replete with a walkway around the lake and cleaning. However, the residents expressed concerns about the works.

February 4, 2017: In data published in the The Hindu with information from the State Assembly Secretariat, it showed MLA S Raghu had attended assembly proceedings  for only 70 days in four years.

June 19, 2017: MLA S Raghu was accused of keeping a number of projects pending during his tenure, the most important of which is the construction of a Railway Over Bridge at the Byappanahalli causing inconvenience to commuters and motorists. He approached the CM in 2013 requesting him to speak to Defence Minister A K Antony for acquiring land from the MEG. The other project being delayed is the cleaning of the Kaggadasapura lake.

October 3, 2017: Residents protesting the construction of a 30-feet walkway on Kaggadasapura lake phoned the C V Raman Nagar constituency MLA, but he failed to pick up the calls, disappointing them.

October 15, 2017: When he visited the family of a 16 year old girl who was washed away by a Storm Water Drain, Raghu was asked to leave the spot, leading to physical confrontations with the locals and his party men.

March 5, 2018: Raghu sounded confident of winning majority votes in the constituency for the fourth time as he openly called the Indian National Congress’ potential candidate Mahadevappa ‘a migrant’.

September 3, 2014: Raghu features in the list of 26 MLAs who didn’t submit their affidavits on assets to the Lokayukta.

October 15, 2017: People were outraged against MLA S.Raghu for negligence.

How did S Raghu make use of LAD funds?

Every year, an MLA is given Rs 2 crores, to spend on developmental works in his constituency. He should allocate the funds for government, community and health infrastructure

☛ Click here for full data set of works done/ sanctioned under S. Raghu’s MLA Local Area Development Funds.

  1. Raghu has spent almost Rs 9.78 crore in five years.

He seems to have devoted a lot of attention to Kaggadasapura lake development. He has spent Rs 6.6 crore, almost three-fourth of his total fund allocation on this.

Apart from this, there does not seem to be any significant expense on any major development work. He spent Rs 1.40 crore on providing water facilities. There are 14 items that list “construction of clean drinking water unit” at Rs 10 lakh each.  

The other parameters on which S Raghu spent a lot included road improvement, help for the disabled and education-related infrastructure.

Read more about his spending in this list of data available here.

The category break up for all the five years looks like this:

Category

Money (lakhs)

Community Infra

28

Desilting

10

Drains

23.5

Disability Help

0.87

Education Infra

75

Lakes& Parks

626

Road Improvement

75

Water

140

Category

Money (lakhs)

Community Infra

28

Desilting

10

Total: Rs 9.78 crore

Comments:

  1. Suraj Yadav says:

    Mr S Raghu, two times MLA from CV Raman Nagar Constituency has utilised almost Rs 6.6 crore from Government funds allocated to his constituency from Tax Payers money for revival and beautification of Kaggadasapura lake.

    Recently the new tubular Pole lights project in Atal Bihari Vajpayee walking track was inaugurated by him with lot of fanfare and publicity.

    However, the upkeep, and maintenance of the lights is not satisfactory.Already several Tubular Pole lights are non functional for many days and despite many citizens and residents staying in adjoining apartments , nobody seems to be concerned or reporting of the same.

    To highlight, the Pole lights Serial number 158,159,162, 166 167, 185 to 189 ,197 and 198( Adjacent to the main Gate of Atal Bihari Vajpayee Park on 5 th Main) are not working for over a week.I could be a simple electrical problem related to power supply or short circuit issues.This reflects on the lack of supervision and accountability of persons responsible for the same.

    Hoping that suitable corrective action and measures will be taken by the team responsible to rectify the problem at the earliest so that the facility created serves the purpose optimally.

    In anticipation of prompt action and corrective measures.

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Pre-poll report card: Citizens raise concerns over urban planning and governance gaps

As the Assembly elections near, residents across Chennai flag zoning violations, poor urban planning amid rapid growth.

As cities grow rapidly, traffic, buildings, and loss of green cover inevitably follow. In 1974, the Chennai Metropolitan Area (CMA) covered 1,189 sq. km; by 2022, it had expanded to 5,904 sq. km, bringing with it challenges of governance. Gaps in governance are foremost on the minds of the 28.3 lakh Chennai voters set to elect their Members of Legislative Assembly (MLAs) on April 23rd. The ruling Dravida Munnetra Kazhagam (DMK) government made 505 promises in 2021, of which it claims to have met 80%. But as residents and citizen groups come up with their manifestos ahead of the April…

Similar Story

In Bengaluru’s Kogilu Layout, evictions create another housing crisis for the city

Months after the Kogilu demolitions, displaced residents still live in tents, citing lack of prior notice and delays in promised rehabilitation.

On December 20, 2025, families in Kogilu Layout, Yelahanka, awoke to the sound of bulldozers and their homes being razed. Vessels, bedding, school bags, medicines, and documents lay scattered around or broken. While official figures state that 167 structures were removed, residents and petitioners report higher numbers.  Beside the rubble, families assembled tarpaulin shelters. Residents say that for several days, makeshift solutions for water, toilets, and electricity were arranged and civil society groups provided temporary relief.  Residents and civil-society groups also allege that there was no written notice before the pre-dawn demolitions. In the aftermath, it is unclear where people slept…