Destroying trees and roads

On the initial stretch from the Ananda Rao Flyover towards Cubbon Park for about a kilometer, the left side of the road has been dug up and heaps of road building materials have been piled up since four to five months.

Our BBMP seems to have achieved a unique double by first felling trees on a large scale and then leaving the roads chosen for widening in a pathetic state.   A great example is Seshadri Road on which I drove last night , when returning from the Railway station.  

We know that the Rain Trees on this road were felled in December last year and the road widening has been underway for one full year on what is only a 2 km road. On one stretch of this road where new trees have been planted and the road fully laid the situation looks good.  

The real shock is however, on the initial stretch from the Ananda Rao Flyover towards Cubbon Park . For a full kilometer, the left side has been dug up and heaps of road building material are found on the road.   The scene was the same even four to five months ago when I took this road.

Hence the net effect is that we have lost around 200 trees and the first half of the road has not even been widened and asphalted. You can imagine the "positive " effect all this has had on traffic on this road! Hope we can find some way to remind BBMP to do their job, even if it is at the cost of the environment.  ⊕

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Riding the Chennai Metro is a breeze, but last-mile connectivity remains a worry

Chennai needs a unified transit system to ensure seamless travel for metro commuters on either side of the journey.

Stepping off the Thirumangalam metro at 6.45 pm, the train ride seemed effortless. It was cool, fast, and on time, taking just fifteen minutes from the office. Now comes the hard part. Standing at the station exit, finding a ride home is a struggle, as I switch between three apps to book an auto. The metro feeder bus only runs every 40 minutes and has just left. By the time I reach home, the "fast" metro trip has cost an extra half-hour and ₹120 in surge-priced rides, a last-mile problem the metro itself was built to solve. This is the…

Similar Story

A four-hour commute: The daily transport struggles of women from Chennai’s resettlement areas

Watch this video to understand how absence of last-mile connectivity and unreliable public transport in Chennai is failing those who need it the most.

Chennai has long had a tradition of public transport usage, with commuters having the choice of the suburban railway network, Metropolitan Transport Corporation (MTC) buses operating in the city and the Metro Rail for their daily transit. Despite the government introducing new services recently, especially electric buses, private vehicles numbers have soared and bus ridership has gone down considerably. Last mile connectivity issues, poor coverage in certain areas and the inability of the government to encourage residents to use public transport are major impediments. In fact, private vehicles make up 65 per cent of all motorised transport in the Chennai…