Urban design challenge: Reimagine these two prominent public spaces in Delhi

Urban Revamp Design Challenge -3.0 is inviting proposals for reimagining two roads in New Delhi's Timarpur Constituency.

Rapid urbanisation in many Indian cities highlights a widespread challenge — inadequate quality of life in public spaces, regardless of location or economic status. This is a common scenario experienced by most Indian cities today, irrespective of their geographical location, level of development and state of economic stability. The quality of life in the public realm is extremely poor.

Reimagining city landscapes/commons

Launched in 2021, The Urban Revamp Design Challenge aims to identify distinctive public spaces for redevelopment, fostering imaginative futures centred around inclusiveness, climate sustainability and community engagement. The Challenge facilitates collaboration among urban planners, designers, architects, local communities, technical experts, and implementation bodies to bring innovative design concepts to life.

Young Leaders for Active Citizenship (YLAC), and Sensing Local as part of the Sustainable Mobility Network (SMN) have opened registration for the Urban Revamp Design Challenge 3.0, being held in New Delhi for the first time. Professionals and students from the fields of architecture, urban design, public space design, spatial planning and other allied fields have the opportunity to submit proposals to reimagine public spaces in two locations in Delhi – Banda Bahadur Marg, GTB Nagar and Chaudhary Fateh Singh Marg, Timarpur.

Poster

Read more: Guess why women avoid cycling in our city


How to register

The competition is open to participants who are professionals or students in the fields of architecture, urban design, urban planning, civil engineering, public space design, spatial planning, and other related disciplines.

  • Entries can be submitted either as a team of individuals or as a firm/office. At least one team member should reside in New Delhi or be able to commute to New Delhi for the public engagement events (visioning workshop and presentation to the community if shortlisted).
  • Interested teams can find the design brief, competition and registration details in the following link: https://www.urbanrevamp.in/
  • The registration deadline is February 18, 2024.

Winners will have the opportunity to pitch to the Government of the National Capital Territory of Delhi and/or relevant government authorities for budget allocation and implementation. Additionally, there is a total prize of ₹50,000 for each site.

So, don your thinking caps and grab your drawing boards, apply now.

[The article is based on a press release from Young Leaders for Active Citizenship, and has been republished with minimal edits.]

Also read:

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Music, play, and community action help residents protect and celebrate Mumbai’s parks

Citizens are reclaiming their parks with LYPMumbai, an initiative that encourages the better use of open spaces through art and music.

They paved paradise and put up a parking lot/ With a pink hotel, a boutique, and a swinging hot spot. These words of the Joni Mitchell classic Big Yellow Taxi filled a corner of Pushpa Narsee Park in Juhu on a bright Sunday morning in March. Though the song was released in 1970, the words resonate in 2026, especially for this park. There have been several attempts to convert Pushpa Narsee Park into a parking lot, only foiled by the vigilance of the locals, says Anca Florescu Abraham, co-founder of Love Your Parks Mumbai (LYPMumbai). This initiative advocates for the…

Similar Story

Uthandi’s ₹91-crore ‘flood drain’: Is Chennai solving one problem by creating another?

The WRD's flood fix puts Uthandi at risk. Residents flag pollution, CRZ violations, aquifer damage, and threats to nearby fishing livelihoods.

The Straight-cut Flood Escape Channel project at Uthandi in the southern part of Chennai along East Coast Road was conceived by the Water Resources Department (WRD) as a flood mitigation measure, with a budget of ₹91 crores. The plan proposes a cut-and-cover drain through the VGP Layout in Uthandi, to connect the Buckingham Canal to the Bay of Bengal. The drain is supposedly meant to divert excess floodwater in Buckingham Canal during heavy rains, when areas around the Pallikaranai marsh and Okkiyam Madavu face flooding.  Work on the project started immediately after its inauguration in August 2025. However, residents of…