Mumbai Metro work expedited, Aqua Line to open early next year

By 2030, Mumbai's Metro system is set to cover a distance nearly equal to the city's old suburban rail and carry 11 million passengers.

Mumbai, India’s financial capital, is admired for its fast-paced life and diverse culture, attracting many people from all over the country. However, the daily life of an average Mumbaikar revolves around managing work along with the stress of crowded trains and traffic-filled roads.

Mumbai, with over 22 million people, is getting extensive 14-line, 360-kilometer network. It is expected to increase the use of public transport, reversing a three-decade decline. The Aqua Line alone is predicted to attract 85% of commuters from using roads. It aims to ease traffic and crowded trains, with authorities promising safety, comfort, and better connections across the city.

By 2030, the Metro system is set to cover a distance nearly equal to the city’s old suburban rail and carry 11 million passengers, surpassing the current 8 million on the railways.

Navi Mumbai Metro

The first Metro line of Navi Mumbai started in the end of November this year after a nine-year delay. Instructing the City and Industrial Development Corporation (CIDCO) authorities, chief minister Eknath Shinde directed to start the Navi Mumbai Metro Belapur-Pendhar Line 1 without an official public ceremony.

Initially laid in May 2011 by former chief minister Prithviraj Chavan, the project faced multiple delays, with its original deadline of 2014 being extended several times due to contractor negligence compounded by the impact of the pandemic.

However, just days after its launch, the Navi Mumbai Metro Line 1 witnessed remarkable success, attracting over 100,000 commuters. It generated revenue of nearly Rs 39 lakh. This success of Line 1 in Navi Mumbai Metro has propelled the CIDCO to expedite the completion of the remaining lines. 

Mumbai metro platform
Just days after its launch, the Navi Mumbai Metro Line 1 witnessed remarkable success, attracting over 100,000 commuters. Pic: Sherine Raj

Consultants are in the process of finalising the detailed project report for Lines 2, 3, and 4, which will be linked to the Navi Mumbai International Airport. The overall construction cost for all four lines is projected to exceed Rs 11,000 crore. 


Read more: Increasing AC trains is cool, but reducing non-AC trains not done, say passengers


Mumbai Metro’s ambitious Aqua line

If all goes as planned, the entire 33.5 km network of Mumbai’s first underground Metro Aqua Line 3 is expected to start by 2024 connecting Colaba to Bandra and SEEPZ Village. 

While significant work on Phase 1, spanning from Aarey to Bandra Kurla Complex (BKC), is expected to be completed by December, it will undergo extensive trials and testing before becoming accessible to the public, likely in early 2024. Concurrently, work on Phase 2, connecting BKC to Colaba, is going on in full swing and is expected to be operational in 2024. That would mark the opening of the entire 33.5-kilometer stretch of Metro’s Aqua line.

Preparations for Phase 1’s commencement involve nine trains, with plans for additional train sets arriving periodically. Mumbai Metro Rail Corporation Limited (MMRCL) officials noted, “Overall, 86 % of the Aqua Line’s work (encompassing both phases) has been completed.”

Mumbai metro station
The entire 33.5 km network of Mumbai’s first underground Metro Aqua Line 3 is expected to be commissioned within 2024. Pic: Sherine Raj

Previous stories:  

Has the Mumbai Metro helped reduce traffic at all?

Since the start of the Mumbai metro Line 1 – between Versova and Ghatkopar through Andheri – in 2014, it has widely been considered a success. It crossed a passenger count of 25 crore people within the first 100 days, faster than any other line in the country. Before the pandemic in 2020, it had surpassed its daily ridership goal of 4.2 lakh in six years.

An updated comprehensive transport study pending, the number of private vehicles in Mumbai has only increased, sales accelerating every year. Compared to the pre-pandemic year of 2019, the first six months of 2022 saw a 28 % increase in car registrations; taking the total number to over 12 lakh. With two-wheelers, buses and trucks added, the total nears 43 lakh.

Link : https://citizenmatters.in/mumbai-metro-ridership-impact-on-cars-traffic-41689

Mumbai metro update: Now a two-year wait for the next line

Running parallel to the Western railway line and Western Express Highway (WEH) at 80 km per hour, the six-car trains with a capacity of 2,280 passengers will easily be the faster and more comfortable option for travel. Their connection to the metro Line 1 running between Andheri to Ghatkopar also opens the east-west corridor to commuters. It is no surprise then that the Mumbai Metropolitan Region Development Authority (MMRDA) expects the ridership to grow tenfold; from a daily maximum of 30,000 to 3 lakh. By 2031, it is hoped the ridership will double to over 6 lakh for both lines each.

Link : https://citizenmatters.in/mumbai-metro-update-now-a-2-year-wait-for-the-next-line-44816

Mumbai Metro progress update: What’s on the cards?

The two yellow and red lines were first proposed and approved in 2015. Construction started in 2016 with a deadline of 2019, and yet, only Phase 1 of the lines is operational today, cutting the journey short to Dahanukarwadi, Kandivali on Line 2A and Aarey, Goregaon on Line 7. The remainder will launch as Phase 2 in five-six months. August 15th is a tentative date.

Link : https://citizenmatters.in/mumbai-metro-progress-update-whats-on-the-cards-31189

Also read:

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

,

Maharashtra cities need a mobility fix: Building roads not a solution

Mumbai and other urban centres in Maharashtra have seen a surge in vehicle ownership, while public transport needs have not been met.

Maharashtra, one of India’s most urbanised States, faces a transportation crisis that has snowballed into a public health, environmental, and economic challenge. With over half its population residing in urban areas, Maharashtra is home to 28 municipal corporations — the highest in the country. Cities like Mumbai and Pune are struggling with the relentless surge in vehicle ownership, which has led to traffic congestion, alarming pollution levels, and a steep rise in road crashes.  Despite these pressing concerns, many cities have pursued an approach focused on expanding road infrastructure, relying on flyovers and highways to absorb traffic overflow. However, experts…

Similar Story

Walkability and affordable transit ignored as elections focus on big projects in Mumbai

Political parties are harping on big-ticket projects, while hardly anyone is focusing on the city's lifelines — BEST and railways.

As the Maharashtra state elections get underway, the daily struggles of Mumbai's citizens, especially their commuting woes, seem to be overlooked in the electoral discourse. Political parties are focusing on massive infrastructure projects, sidelining the city's lifelines like the Railways and the Brihanmumbai Electric Supply and Transport (BEST) Undertaking in favour of the Metro Rail. Despite being partially operational, the Metro has yet to make a significant impact. Surveys reveal that 52% of Mumbaikars walk to work, yet on many roads, pedestrian infrastructure remains neglected, encroached upon, and unusable. While traffic congestion has made commuting a nightmare, trains are perennially…