How is Chennai preparing to tackle the rains?

Take a quick look at the various administrative and technical measures that the state has planned with an eye on prevention and management of flood situations in the city.

The floods of December 2015 have made the various departments of the Government think beyond conventional solutions for Disaster Management.

As part of a long term plan, the Tamil Nadu Urban Infrastructure and Financial Services Ltd (TNUIFSL) is currently floating a tender for an Early Warning System, that would typically predict the areas and levels of inundation depending on the rain forecast. This will take into account the level of moisture in the soil, which will increase the accuracy of the prediction. This is expected to take about 2-3 years.

LiDAR mapping, a remote sensing method that uses light in the form of a pulsed laser to measure variable distances, will be done as a part of this study. This can generate precise, three-dimensional visualisation of flood-prone areas across the Greater Chennai Area, with an accuracy of within 20 cm. Due to the nature of the study, the area will include all the catchment basins of Chennai, including Kosasthalayar, Cooum and Adyar, and all the minor drainage channels.

Large-scale and detailed bathymetry surveys (survey of underwater topography) are also to be carried out for higher accuracy. As part of the study, the number of rain gauge stations is also going to be increased, thereby increasing the accuracy in weather predictions.

The Tamil Nadu e-Governance Agency (TNeGA) is working with IBM and Greater Chennai Corporation to do flood inundation mapping for Chennai City. This would help Greater Chennai Corporation to plan rescue efforts in advance, based on the amount of rainfall predicted.

Infrastructure departments like the Department of Highways and PWD are working to improve the public assets under their control by doing large scale desilting and dredging operations. Most of the desilting has been done near the mouth of the major rivers in Chennai. It has been done in the banks and locations where river flow is low, as these are the areas where siltation is high. Some encroachments have been removed upstream to facilitate easier flow.

The Disaster Management and Mitigation Department that comes under the Revenue Department is setting up a Command Center to facilitate rescue and response.

CMDA has, in the past, done many studies that highlight the locations where serious interventions are required, and also the historic context and how the problem has evolved over the years. Some of these projects were initially managed via the JnNURM 1 & 2. Other states have tapped into schemes like AMRUT (Atal Mission for Rejuvenation and Urban Transformation) to jump-start work on similar areas.

Even the judiciary has done its part by putting a stay on registration of many unauthorised layouts, specifically the ones near water bodies.

There are other plans also to evaluate the level of deficiency in the drainage system across Greater Chennai.

(Watch this space for more urban updates)

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

The real estate shift: How Karnataka’s proposed apartment law shortchanges homeowners

Karnataka apartment owners may not get a fair share of their land as the KAOMA 2026 replaces value-based UDI with an area-only formula.

The Karnataka Apartment (Ownership and Management) Bill, 2026 (KAOMA) changes how a homeowner's share of the land is calculated — and the new formula gives the individual less than what the old law, that is the Karnataka Apartment Ownership Act, 1972 (KAOA), promised. The KAOMA Bill was passed by the Karnataka legislature in August, but is yet to receive assent from the Governor, who has sought clarifications on certain provisions. What is UDI and why does it matter? When you buy an apartment, you buy two things: The flat — a depreciating asset (buildings lose value over time). Your Undivided…

Similar Story

Big promises, unheard residents: Bengaluru’s new parking rules need a rethink

The draft rules meant to manage road space demand end up expanding supply, outsourcing enforcement, and pricing residents out of their streets.

On August 11, the Urban Development Department quietly published the draft Greater Bengaluru Authority (Parking) Rules, 2026 — the legal framework  meant to give teeth to Bengaluru's much-discussed Parking Policy 2.0. Citizens have thirty days to send in objections. Yet, few will read all eighteen pages of the notification. Fewer still will notice that a law framed as a way to curb traffic demand is, on close reading, a plan to expand parking supply and hand over enforcement to private players, while leaving the ordinary resident worse off.  That gap between the promise and what’s on paper matters, because parking…