Muddy, slippery roads pose danger at Rajarajeshwari nagar

After laying drainage pipes, the civic agency forgets to fix the road, making it a dangerous stretch.

I am a resident of BEML Layout, Rajarajeshwari nagar, 7th cross, 9th main, 3rd stage . BWSSB laid the new drainage pipes two months ago. But no on has bothered to bring the road back to normalcy. The drain pipes are just closed with loose soil and even extra soil present on the road is not removed.

Vehicles plying on the road get stuck in the loose mud often. Elderly and children find it difficult to walk and have often had falls.

When it rains, the road is all slushy. Pic: Anand R

9th main looks like a dirt track. Pic Anand R

7th cross too suffers the same fate. Pic: Anand R

No tar on the slippery road. Pic: Anand R

Water stagnating on the road. Pic: Anand R

Water in the rainwater drain. Pic: Anand R

Spot for car tragedies. Pic: Anand R

Will the concerned department please look into it fix the road?

Comments:

  1. Chidambar Rao says:

    9th Main, 3rd stage, Rajarajeshwarinagr, Bangalore is the only road in RR Nagar has not been repaired so for after laying the draingae piple line during Dec 2010. several requests and reminders to BBMP authorities have gone waste. Unable to find to whom to contact further. It is a curse to stay as the dust layer in the house is non bearable and people are suffering from sickness.
    Can the authorities will wake up and repair the road stretch between Raghavendra Mutt and Hanuman Steels in RR Nagar 3rd Stage??

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Riding the Chennai Metro is a breeze, but last-mile connectivity remains a worry

Chennai needs a unified transit system to ensure seamless travel for metro commuters on either side of the journey.

Stepping off the Thirumangalam metro at 6.45 pm, the train ride seemed effortless. It was cool, fast, and on time, taking just fifteen minutes from the office. Now comes the hard part. Standing at the station exit, finding a ride home is a struggle, as I switch between three apps to book an auto. The metro feeder bus only runs every 40 minutes and has just left. By the time I reach home, the "fast" metro trip has cost an extra half-hour and ₹120 in surge-priced rides, a last-mile problem the metro itself was built to solve. This is the…

Similar Story

A four-hour commute: The daily transport struggles of women from Chennai’s resettlement areas

Watch this video to understand how absence of last-mile connectivity and unreliable public transport in Chennai is failing those who need it the most.

Chennai has long had a tradition of public transport usage, with commuters having the choice of the suburban railway network, Metropolitan Transport Corporation (MTC) buses operating in the city and the Metro Rail for their daily transit. Despite the government introducing new services recently, especially electric buses, private vehicles numbers have soared and bus ridership has gone down considerably. Last mile connectivity issues, poor coverage in certain areas and the inability of the government to encourage residents to use public transport are major impediments. In fact, private vehicles make up 65 per cent of all motorised transport in the Chennai…