Citizen forum convened in Shakambarinagar ward

Residents get together and convene a forum for civic issues; Drain work starts in Jayanagar.

Like minded citizens of Shakambarinagar ward have come together to form a citizens’ forum to address the civic issues of the ward and closely work with the elected representatives as well as civic authorities. The organisation meets every fortnight (Monday) at their office in JP Nagar.

Shakambari Nagar Citizen Forum members meeting MLA B N Vijayakumar and Corporator Somashekar at their office. Pic: Raghavendra.

Below are some issues pertaining to Shakambari Nagar Ward:

–    Installation of ward name boards at all the four boundaries of Shakambari Nagar.
–    Installing of street/ Road boards which are broken or defaced.
–    Identifying and desilting of storm water drains, road side drains, shoulder drains.
–    To install solar lighting at streets and parks on a pilot basis. Pruning of tree branches planted by BBMP which is hindering the services of telephone and electric supply and also free movement of vehicles.
–    Footpaths have been used for dumping construction materials, unauthorised sheds have been erected and parking of vehicles to be stopped.
– Regular mosquito fogging and spraying of insecticides in the water logging areas.
–    It has been observed that in many buildings the basement parking area have been used for commercial activities which has to be reverted.
– It is observed that BESCOM officials prune the tree branches on the street and leave it there without bothering to shift the same to a designated place which is hindering the free movement of pedestrians. This has also been brought to the notice of Engineers concerned on several occasions.
–    To examine the possibility of extending the 9th Main Road from 4th Block to J P Nagar to ease the traffic congestions on Sarakki Main Road and 11th Main Road, Jayanagar.
–    There are over 40 electrical transformers which are situated on the foot path which is hindering the free movement of pedestrians which are to be shifted or converted into single pole transformers. BBMP/BESCOM has to do the needful.
–    It has been observed that many of the transmission towers and related generator sets are installed on the topmost floor of the buildings and residences. We feel that most of them are dangerously positioned and unsafe. The concerned authorities have to take necessary steps to prevent loss of life and property.
–    There are three newly erected BMTC Bus Shelters on 46th Cross between 9th Main to 11th Main (within 100 meters) 5th Block citizens are in the dark as to where the buses stop. BMTC/BBMP traffic police to make note of it.

We have observed that the posters and advertisements hand bills are being pasted on trees. Bus shelters, walls, telephone, electric poles, which is defacing the beauty of the locality. Action should be taken against offenders. Whenever a major developmental decision is taken pertaining to the ward, the authorities should consult the public before implementing it.   

Contact: T S Krishnamurthy, Shakambari Citizens’ Forum Convenor. Ph: 9632726796.

Info provided by Forum member, N Mukund.

~~~

Building of a new drain started on Tuesday July 13, at 9th Main 36th cross. The 1 km drain will stretch from National College Park (Pattabhirama Nagar) to Marenahalli (Shakambari Nagar) and is being built at a cost of Rs 1.8 crores. Corporators of Pattabhirama Nagar and Shakambari Nagar, C K Rama murthy and B Somashekar, along with Jayanagar MLA B N Vijayakumar attended the foundation stone ceremony. The project will be completed in three months.

Jayanagar drain works start. Pic: Chetan Boray.

Drain work foundation stone ceremony. Pic: Chetan Boray.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Bengaluru Buzz: Rain breaks 150-day hot spell | Addressing water woes… and more

Other news of the week: Drive to increase lifespan of trees, Koramangala Valley waterway to be completed by Aug 15th and LED project revived.

Showers break 150-day hot spell Sources from the India Meteorological Department (IMD) had said that dry weather may prevail in the city till May 5th, but light showers on May 2nd brought relief. It had been a zero rainfall month in April, a first since 1983 - and one of the longest dry spells of nearly 150 days since November 2023. The rains also brought in the usual issues of water logging, power outages and traffic bottlenecks. May Day was the hottest of the month so far in 40 years, touching 38.1 degrees Celsius. Kempegowda International Airport showed the highest…

Similar Story

Mumbai Buzz: Two die in a manhole accident | Metro 3 trials begin and more…

Other news in Mumbai: Two children suffocate to death in abandoned car; Bombay HC rap for demolishing galas; Leopard captured at Vasai.

Two die, third critical after falling into manhole Mumbai continues to see tragic accidents related to manual scavenging and deadly manholes. Two people died and a third is critical after falling into a 30-foot-deep manhole in Malad. The manhole was connected to a drain pipe on the site of a private under-construction building at Pimpripada in Malad east. Raju, who was a worker at the site, fell in and after that two nearby residents, Aqib and Javed jumped to save him. When none of them came out, the locals called the fire brigade to rescue them. According to the preliminary…