‘Temporary’ situation that has lasted 2 decades

Garbage dump outside BDA complex is causing inconvenience to the shopkeepers and residents around that area.

Lack of trash pickup points nearby has made 6th cross, 3rd block Koramangala near BDA complex a garbage dumping space for over 20 years now. Pourakarmikas say the garbage pickup truck comes about once a week to clear it. Devi, a pourakarmika says, "We have been dumping the garbage of the whole locality here. The BBMP truck comes and collects it whenever they want."    

Garbage dump at BDA complex, Koramangala. Pic: Anisha Nair     

The garbage menace has been bothering residents and shopkeepers alike. A tea stall owner outside the BDA complex, who did not want to be named, says, "people standing here for tea have to deal with the bad smell because of the garbage dump there."

Lakshmi Raman, a resident of Koramangala says, "we can not walk in from the 6th cross. The garbage is always all over the footpath and it stinks a lot."

BBMP however claims that this is a temporary situation. Savithri S, Environmental Engineer, Koramangala, says, "we do not have a particular pickup point in Koramangala 3rd block so it is the temporary pickup point till the new point is decided."  

H T Bettegauda, Superintendent Engineer, South Zone, BBMP, says "I will ask the Environmental Engineer to contact the concerned person and get the garbage cleaned right away. It will not be dumped there from now."

 

Comments:

  1. Hanna Ciuba says:

    It’s terrible sight! Why are the streets not garbage cans? It would be easier to take them in garbage truck, which should drive every day. This is a great shame for such a beautiful city. I think that we should talk about it with children. Let them learn now that this situation endangers their health and the environment in which they live.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Bellandur Lake rejuvenation: An urgent call for action

Citizens have strongly disapproved the slow progress on Bellandur Lake's rejuvenation project. Immediate intervention is needed to avoid failure.

Bellandur Lake, Bengaluru’s largest water body, has been at the heart of an ambitious rejuvenation project since 2020. However, persistent delays, severe funding shortages, and inadequate planning have left citizens increasingly frustrated. Time is slipping away, and without immediate government intervention, this critical environmental project risks failing. A recent meeting with government bodies shed light on the project’s stagnation and the urgent steps required to salvage it. Progress so far Desilting Work: Of the estimated 32.33 lakh cubic meters of silt, 22.69 lakh cubic meters (70%) have been removed, leaving 30% unfinished Early monsoons and slushy conditions have delayed progress…

Similar Story

Assembly elections Maharashtra: Meet your new MLAs, Mumbai

The Mahayuti has swept the Maharashtra assembly elections, and government formation will happen soon. Here is a list of the newly elected MLAs.

Riding on the success of Ladki Bahin Scheme and a flurry of manifesto promises from better pension for older people, increased honorarium for Asha and Anganwadi workers, the Mahayuti - BJP, Shiv Sena (Eknath Shinde)  and NCP ( Ajit Pawar) have swept the assembly elections with a tally of 230 out 288 seats in Maharashtra and 22 out of 36 seats in Mumbai. They are yet to announce the chief minister amidst heavy speculation as successful MLAs celebrate. As various reports and analyses indicate that the main factors were launch of welfare schemes or promises of the same, communal agenda…