Chennai Buzz: PPE kits dumped | New police chief for Chennai | Multi-level parking project updates…and more

Latest updates on the COVID front in the city and news of other developments during the week that passed

COVID-19: Walkie-talkie for healthcare workers, number of fever camps to be increased, PPEs dumped at Kodungaiyur

On July 3rd, Chennai recorded 2,082 fresh COVID cases, taking the state’s total to 4,329 for the day. Meanwhile 2,357 recovered and 64 patients succumbed to the disease in the state on the same day.

Infographic summary of COVID-19 cases in Chennai as on July 4. Pic: GCC/Twitter

Rajiv Gandhi Government General Hospital has distributed 20 walkie-talkie devices and 20 mobile phones to healthcare providers in COVID wards for better communication. According to the hospital Dean Dr E Theranirajan, each floor will have a common phone number with which doctors, staff nurses and others on COVID-19 duty can be contacted. Relatives of COVID patients can also dial in and speak to the patients. 

With the number of people visiting fever camps in Chennai having increased, the Greater Chennai Corporation (GCC) plans to increase the number of camps. As many as 11,736 camps have been conducted in Chennai that saw a footfall of 7.41 lakh people; 33,090 cases of Influenza-like Illnesses (ILI) were reported till July 3rd. The camps also collected 29,051 swab samples for COVID test. For every ward, the civic body has arranged two camps, and four in hotspots. Further, the corporation plans to introduce two/three more Siddha centres in the city.  

To track patients who are home quarantined, the civic body has rolled out an application named HQIMS (Home Quarantine and Isolation Management system) that will have basic details of people in home quarantine.

For the welfare of construction workers, the civic body will soon deploy mobile medical units across 15 zones that will screen people at construction sites. It has requested the Department of Public Health, Tamil Nadu, for deputing more doctors and nurses. 

Biomedical wastes such as PPEs, masks and goggles used by frontline workers on COVID duty are reportedly being dumped at the Kodungaiyur dump yard by the civic body lorries. Waste pickers in the yard stated that the lorries regularly dump the safety kit in pits. It may be noted that unsafe disposal of biomedical wastes pose a huge threat. According to the Biomedical Waste Management Rules, 2016, the kits should be incinerated. 

Source: The Hindu | The New Indian Express

Chennai gets a new CoP

In a major rejig of IPS officers in Chennai, Mahesh Kumar Aggarwal took charge as Commissioner of Police, Greater Chennai City, this week, while his predecessor, A K Viswanathan, was posted as Additional Director General of Police, Operations. 

Soon after announcing about an online public grievance system, Mahesh took to Twitter to announce redressal through a video call. He can be reached at 63691 00100 on Mondays, Wednesdays and Fridays between 12 noon and 1 pm.

Source: The Hindu

NGT appoints a committee to review Kadaperi lake

A joint committee has been appointed by a National Green Tribunal bench comprised of Justice K Ramakrishnan and expert member Saibal Dasgupta, to inspect Kadaperi lake in Tambaram and estimate the environmental compensation for violations and the damage caused. Due to encroachment, the water body has shrunk to 40 acres. Originally, the lake was spread across 65 acres. 

A project worth Rs 3.5 crore, submitted by the Tambaram Municipality, to desilt the water body has not been completed. The water body resembles the infamous Cooum river now, with sewage from the Tambaram Municipal area, Tambaram Railway Colony and MTC Workshop all draining into the lake.

Source: The Hindu

Chennai Peripheral Ring Road project update

The State Highways Department has initiated the land acquisition project for the Chennai Peripheral Ring Road, which connects Ennore Port to Mahabalipuram. The project will be executed in five sections and the construction phase will begin by 2020-2021.

Notification for acquiring 59,608 square metres of land at Polivakkam village (Thiruvallur) has been given. This part, the third section, connects Thiruvallur bypass with Sriperumbudur on the Chennai-Bengaluru highway.

  • First section: Ennore Port to Thatchur on NH-5 (25.50 km stretch)
  • Second section: Thatchur on NH-5 to the start of Tiruvallur Bypass (26.25 km) 
  • Third section: Thiruvallur Bypass to Sriperumbudur on NH-4 (29.55 km)
  • Fourth section: Sriperumbudur on NH-4 to Singaperumalkoil on NH-45 (24.85 km) 
  • Fifth section: Singaperumalkoil to Mahabalipuram on East Coast Road (ECR) (27.50 km)

Source: DTNext

80 locations identified for multi-level parking project

Eighty sites have been identified for kickstarting the multi-level parking project under the Smart City Mission. In the first phase, the civic body will carry out work in 38 locations, which are located in the vicinity of transport hubs. Consultants have been invited for preparing a detailed feasibility report. The purpose of the project is to design off-street parking space for 2 lakh four-wheelers and 2 lakh two-wheelers in Chennai.

Source: DTNext

Compiled by Bhavani Prabhakar

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Warnings overlooked: Mumbai floods intensify despite reports and recommendations

Years after the deluge of 26th July 2005, Mumbai continues to flood every monsoon and expert committee reports on flood mitigation lie ignored.

A day before the 19th anniversary of the 26th July deluge, Mumbai recorded the second wettest July ever. Needless to say, the city also witnessed multiple incidents of waterlogging, flooding and disruption in train services and traffic snarls. Some of the explanations for the floods included record heavy rains, climate change, inadequate desilting of drains. There were protests on the ground and outrage on social media.   Incidentally, floods — its causes and solutions in Mumbai — have been studied since 2005, when the biggest and most damaging flood struck Mumbai and claimed 1094 lives after the city witnessed 944.2 mm…

Similar Story

After long wait for landowners, construction set to begin in EVP Township

The EVP Township Landowners' Association is working to develop their 18-year-old township with support from the Tharapakkam Panchayat

For years, long-time residents of Chennai, who bought plots in a suburban township in Tharapakkam, had to endure many hardships before they could rightfully claim their land. However, they did not give up. And now, there is a glimmer of hope as the persistence of the landowners has borne fruit. The local panchayat has also agreed to extend support, so that they can build their dream homes. In 2006, EVP Housing Pvt Ltd released colour advertisements in newspapers and distributed flyers offering plots for sale in Tharapakkam. These plots would form a township known as the EVP Township, situated five…