JDS manifesto for BBMP election – 2015

JDS promises to create a Bengaluru Waste Management Authority, wants to limit road widening and solve Bangalore's traffic problem with underpasses and skywalks.



 

JD(S) manifesto – BBMP election 2015

  • Constructing 124 road underpasses to reduce accidents
  • Limiting road widening to only 21 roads and cancelling the notification to widen 98 roads
  • Establishing Central Processing Office to track property related transactions
  • Removing encroachments and rejuvenate all water tanks / build dams across big Rajakaluves
  • Building a nine-stage multiplex for vocal and visual arts on the lines of Sidney Opera
  • Improving digital connectivity by building new networks, Wi-Fi connection throughout the city
  • Creating Bengaluru Waste Management Authority
  • Taking help of private sector to run BBMP schools under CSR initiative
  • Introducing Title Value Protection scheme to property holders
  • Implementing ‘Universal access to healthcare’ scheme though Bengaluru Public Health Authority
  • Constructing 5,00,000 affordable dwelling units
  • Installing Work Programme Tracking and Building Plan software in BBMP
  • Efficient garbage disposal with emphasis on source reduction and reuse. Incineration and landfill is last option
  • 11-points citizens’ agenda to prevent plastic usage

JD(S) manifesto in 2010 (Source: http://bit.ly/1LaCI4m)

  • Playground and library in every ward
  • Change in office timings and introduce one-way for easing traffic
  • 25 per cent property tax concession to the residents of newly added BBMP wards
  • Mandatory rainwater harvesting in new buildings
  • Insurance to all BPL families
  • Stringent license norms to regulate industries
  • General hospital and maternity home in every assembly constituency
  • Construction of parallel roads in places with high traffic density
  • Construction of multi-storey parking
  • Free medical check up, eye surgery for senior citizens
  • Special insurance scheme for unorganised workers
  • Reviewing SAS
  • Withholding Capital Value System and studying it scientifically
  • Park in every ward and a small forest in new wards

Here is the full manifesto of JDS for BBMP elections 2015:

[embeddoc url=”https://citizenmatters.in/wp-content/uploads/2015/08/jds-bbmp-manifesto.pdf” download=”none”]

Related Articles

BJP manifesto for BBMP election 2015
BBMP Elections 2015: Special coverage by Citizen Matters
‘Cash for coverage’ comes to BBMP elections too

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Fishers of Thiruvanmiyur Kuppam: Aborigines of the coast, not ‘Beach Grabbers’

Fishers of Chennai's Thiruvanmiyur Kuppam challenge encroachment claims, defending their long-standing rights amid coastal development.

The dispute between the fishermen and the more affluent, non-fishing residents of Thiruvanmiyur and Besant Nagar has simmered for years, highlighting tensions over land use, development, and livelihoods. Acting upon the complaint from the residents (non-fishers) in the locality, the GCC demolished the temporary constructions made by the fishers of Thiruvanmiyur Kuppam in June this year. Being less than 40 metres from the coastline, they were termed encroachments. A mainstream news outlet even referred to fishers' construction as ‘beach robbery,’ emphasising concerns that the illegal construction of houses and pathways could lead to the loss of turtle nesting sites and…

Similar Story

Bellandur Lake rejuvenation: An urgent call for action

Citizens have strongly disapproved the slow progress on Bellandur Lake's rejuvenation project. Immediate intervention is needed to avoid failure.

Bellandur Lake, Bengaluru’s largest water body, has been at the heart of an ambitious rejuvenation project since 2020. However, persistent delays, severe funding shortages, and inadequate planning have left citizens increasingly frustrated. Time is slipping away, and without immediate government intervention, this critical environmental project risks failing. A recent meeting with government bodies shed light on the project’s stagnation and the urgent steps required to salvage it. Progress so far Desilting Work: Of the estimated 32.33 lakh cubic meters of silt, 22.69 lakh cubic meters (70%) have been removed, leaving 30% unfinished Early monsoons and slushy conditions have delayed progress…