All you need to know about Ward 79 – Sarvagna Nagar

What were the works done in Sarvagna Nagar ward in the last five years? How much money was spent on it? What are the issues troubling the residents?

79 – Sarvagna Nagar

Some of the job codes for this ward have no description of the work to be done. This means the contractor gets paid without anyone having a chance to even know what he did, in the future, forget checking the quality of the work done. Here is more information on Sarvagnanagar ward.

MLA (2013): S Raghu (BJP), C.V. Ramannagar (SC)
MP (2014): P C Mohan (BJP), Bangalore Central

BBMP 2010:

Corporator: G. Bhuvaneshwari (BJP), Reservation:SC
#3208, 6th main road, 13th cross, H.A.L, Indiranagar, Bangalore-38. Ph:9945630799

Votes:
Winner’s percentage: 19
Winner’s margin:619
Total votes for the winner: 13349
Total voters: 33389

BBMP 2015:

Total voters: 32874
Male: 17434
Female: 15420
Others: 20

Reserved: OBC-A (Women)

Contesting Candidates:

BJP: Shashirekha Mukund
INC: Manjula
JDS: Swapna

Demographics

Population (2011): 37291
Voters: 31741
Households: 9052
Area: 3.6sq km

Civic Amenities/Infrastructure

Road length: 231 km
Lakes: Kadirena Palya (Binnamangala), Total area:5.9 sq km
Parks: 7, Total area:4 sq km
Playground: 1, Total area:0.1 sq km

Active Citizen groups/RWAs

 

If you represent any RWA from this area, please click here and fill your info. It will be added to this space after verification.

Candidates

These are the candidates contesting the BBMP elections- 2015, whose information is available with Citizen Matters. If you do not find a particular candidate on this page, do ask them to fill the Candidate Information Form as soon as possible.

How was the money spent? Tenders, job codes, bills:

  • Click on the sections corresponding to complaints, tenders and bills, to get a feel of what are the problems, what is being addressed, how much money is being spent, and is it really happening on ground.
  • Scroll using your arrow keys to see the details within the sections.

Click here to view the raw data.

What’s bothering the residents? Complaints represented in a wordcloud:

Data Courtesy

BBMP, Janaagraha, BBMP Restructuring Committee website

Disclaimer: This data is an extract; it is not complete, and not verified independently. It is not from the entire tenure of BBMP council 2010-15.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Fishers of Thiruvanmiyur Kuppam: Aborigines of the coast, not ‘Beach Grabbers’

Fishers of Chennai's Thiruvanmiyur Kuppam challenge encroachment claims, defending their long-standing rights amid coastal development.

The dispute between the fishermen and the more affluent, non-fishing residents of Thiruvanmiyur and Besant Nagar has simmered for years, highlighting tensions over land use, development, and livelihoods. Acting upon the complaint from the residents (non-fishers) in the locality, the GCC demolished the temporary constructions made by the fishers of Thiruvanmiyur Kuppam in June this year. Being less than 40 metres from the coastline, they were termed encroachments. A mainstream news outlet even referred to fishers' construction as ‘beach robbery,’ emphasising concerns that the illegal construction of houses and pathways could lead to the loss of turtle nesting sites and…

Similar Story

Bellandur Lake rejuvenation: An urgent call for action

Citizens have strongly disapproved the slow progress on Bellandur Lake's rejuvenation project. Immediate intervention is needed to avoid failure.

Bellandur Lake, Bengaluru’s largest water body, has been at the heart of an ambitious rejuvenation project since 2020. However, persistent delays, severe funding shortages, and inadequate planning have left citizens increasingly frustrated. Time is slipping away, and without immediate government intervention, this critical environmental project risks failing. A recent meeting with government bodies shed light on the project’s stagnation and the urgent steps required to salvage it. Progress so far Desilting Work: Of the estimated 32.33 lakh cubic meters of silt, 22.69 lakh cubic meters (70%) have been removed, leaving 30% unfinished Early monsoons and slushy conditions have delayed progress…