How to segregate waste in apartments?

Segregation of garbage at source comes into effect in Bangalore! Here is a guide to 'Solid Waste Management' in apartments.

Here is a simple process to initiate waste management that results in maximum participation among residents and sustained evolution of the practice.

Pic source: Green Commandos

Preparation / Infrastructure

The first phase of the entire drive is to set up the related infrastructure to support the waste segregation initiative at the apartment. The infrastructure involves the following steps:

  • Determining the service provider who will collect the dry recyclables from the apartment on a regular basis. This step also involves coming to a common understanding on the frequency of collection and financial obligations of the service providers/apartments.
  • Determining the collection mechanism to be adopted at the apartment. The mechanism involves:
    • Collection frequency of the dry waste from individual houses (e.g. once a week).
    • Mode of collection of dry waste from individual houses. Either of the following method can be adopted.
      • Housekeeping staff collecting waste door-to-door.
      • Residents disposing waste themselves at common location (basement etc,.)
    • Mode of disposal of waste from individual houses. Any of the following modes can be used:
      • Using weaved plastic bags (reusable with life of a year, Rs 10 per bag) with house numbers given to each house through the association (ensures consistency in disposal).
      • Each house using their own bags/cartons etc,. to dispose waste (not recommended).
    • Number and placement of common bins in the apartment premises (eg two bins set up in the basement etc,.)
    • Number of primary segregation required from individual houses. The number may differ from house to house, and also depend on the service provider (eg some service providers may want paper to be separated from plastics). The four generic types of primary segregation are:
      • Wet kitchen / biodegradable waste (eg: fruit and vegetable peels, cooked food waste etc,.)
      • Dry recyclable rinsed waste (eg: paper, plastics, metal, cardboard etc,.)
        • To be collected by one of the service providers listed below.
      • Electronic waste (eg: CDs, old printers, CFL bulbs, and tube-lights etc.)
        • To be collected by one of the service providers listed below.
      • Hazardous biomedical waste (eg: Bathroom rejects such as hair, used sanitary napkins etc.)
        • To be given out in newspaper bags, with a red cross on the bag.
    • Whether housekeeping staff to be utilised for secondary segregation of the dry recyclable rinsed waste. This will fetch a higher price for the dry recyclable waste, but with the trade-off of the house-keeping staff’s time.
    • Training for house-keeping staff to get them oriented for the new collection mechanism (if house-keeping staff to be utilized for collection of waste). If the apartment has an Organic Waste Converter (OWC) installed but not commissioned, house-keeping staff also need to be trained to operate the OWC.

 

Apna Complex, an apartment management software firm, provides a template that could help apartment Managing Committees create a Solid Waste Management plan easily. Click here to download the plan.

Awareness / Initiation

  • Once the above preparations have been made, the next step is to have an awareness presentation for the residents and housemaids to make them appreciate the reason for the exercise, and get commitments from them to participate.
  • The presentation also doubles up as a sign for residents to start segregation. Bins and bags should have been procured by this time, the service provider finalized, and training given to housekeeping staff.
  • Once the segregation starts, more residents need to be encouraged to take up volunteering roles to promote the practice (such as being a block coordinator, floor coordinator etc,.) This is a key step, and it will ensure that responsibilities are evenly distributed among the residents. In the absence of such a structure, the entire onus of sustaining the project may fall on a handful of people, which becomes very difficult.

Sustenance / Follow-up

  • A door to door audit can be performed once the practice has been in place for close to three months to ensure people are segregating waste.
  • A starter kit should also be prepared for new residents/tenants coming into the apartment complex to ensure that the practice continues consistently over a period of time.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

झोपडपट्टी पुनर्वसन प्राधिकरण कायद्याच्या चौकटी बाहेर : जय भीम नगरच्या रहिवाश्यांनी कुठे जायचं?

या मालिकेच्या पहिल्या  भागात, आपण बघितले  कि कशी जय भीम नगरच्या रहिवाश्यांची घरं पाडली गेली आणि त्या ठिकाणी असलेल्या हिरानंदानी गार्डन्सच्या कायदेशीरदृष्ट्या संशयास्पद इतिहासाचा आढावा घेतला. ५ ऑक्टोबर रोजी, मुंबई उच्च न्यायालयाच्या शिफारशीनुसार पवई पोलिसांनी बीएमसीच्या एस वॉर्डमधील अधिकाऱ्यांवर, हिरानंदानी ग्रुप (HGP Community Pvt Ltd) आणि चार सहकाऱ्यांवर जय भीम नगरमध्ये अनधिकृत पाडकाम केल्याबद्दल एफआयआर नोंदवला. आरोपींवर गुन्हेगारी कट, सार्वजनिक सेवकाने इजा करण्याच्या उद्देशाने चुकीचा दस्तऐवज तयार करणे आणि खोटी माहिती पुरवणे यांसारख्या आरोपांचा समावेश आहे. पाडकामापूर्वी जय भीम नगरमध्ये राहणाऱ्या ६०० -६५० कुटुंबांपैकी सुमारे १००-१५० कुटुंबे अजूनही तिथे राहत आहेत. मागील काही महिन्यांत तीव्र पावसाचा सामना करत राहिलेल्या या…

Similar Story

Bengaluru’s misplaced priorities: Tunnel road, sky-deck and expressways

A petition to the state to avoid costly projects such as the Tunnel Road and sky deck, as many basic needs of the city remain unmet.

The Karnataka Cabinet has cleared two big-ticket projects: Tunnel Road and Sky-Deck. The BBMP’s DPR for the Bengaluru Tunnel Road is for a six-lane, 18-kilometre underground tunnel that will connect Hebbal in the north to the Central Silk Board junction in the south. The project is estimated to cost around Rs 16,500 crore. The proposed 250-metre-high sky deck, supposed to become the tallest tower in South Asia, is estimated to cost Rs 500 crore. The tunnel roads may be extended, there may be other expressways, flyovers, double-decker roads, etc., in the pipeline. All these projects taken together are expected to…