BBMP yet to learn lessons from the drain-death of eight-year-old girl

BBMP is yet to repair the footpath in Bilekhalli, even 50 days after the death of eight-year-old Geethalakshmi , who was washed away in the area.

On October 6th, eight-year-old girl, Geethalakshmi who was in Bengaluru for her Dasara holidays, was washed away, after falling into a four-feet wide open drain on a footpath near Bilekahalli. Her body was found in the Madiwala lake after two days. The incident fired up the anger of citizens towards BBMP’s maladministration.

After this incident, BBMP promised to repair the footpath. In a PIL related to the incident, the High Court rapped BBMP and gave a deadline to repair all footpaths, and finally things seemed to be moving in the right direction.

Well, if you thought everything was alright, you are mistaken. Here is the condition of a footpath in Bilekahalli as seen yesterday:

$(document).ready(function(){ $(‘.carousel .carousel-inner .item’).first().attr(‘class’, ‘active item’);});

​Citizen Matters reader, Ananthraman S, a resident of Bilekhalli and a senior citizen, writes in:

“Mr Modi symbolically took the broomstick to clean the country, but sadly people have taken it as a mission to clean the country for a day. Every day,  we find some organisation or the other taking the broomstick, without a thought on sustainable corrective and preventive action.

Here are pictures of the footpath in front of Janardhana Towers, the main link to Bilekahalli market for the citizens of the Ranka road. Sadly, even after a child has given her life in the vicinity, and a month after putting the materials in place, the work is not completed. The footpath in question is not even 100 feet long—with what efficiency is our government working?

If the culture and mindset of people don’t change, nothing can change in our country. It’s about time everyone focuses their efforts to make sustainable changes in small pockets, instead of wearing t- shirts and caps and taking the jhadoo for a day for media attention.

Anyone listening?”

Though everything is ready and the materials are in place to begin the repair work on the footpath, the BBMP is strangely delaying the work, continuing to put the life of pedestrians in peril.

Citizen Matters tried reaching the authorities concerned, including Roopa Ramesh, Councillor of Bilekhalli ward and Sarvothama, Assistant Executive Engineer of Bilekhalli ward, to enquire about the delay, but there has been no response so far.

On calling the BBMP Commissioner, Lakshmi Narayana, he asked for a message to be sent with details of the footpath and road in question, and stated that if work has not already been done on the footpath, he would follow it up with his team.

​It remains to be seen whether the BBMP will keep its promise, and how many more days it will take to close this drain.

Related Articles

Are you listening, Mr Corporator?
When is a footpath not a footpath?
21st century marvels in Bangalore: Don’t miss visiting them!

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

From flood control to potable water, will the Mamallan dam truly deliver on promises?

Slated to solve Chennai’s water crisis, the Mamallan reservoir project may deepen existing issues, causing flooding and increased salinity.

Mohana S recalls how Kanima Nagar in Periya Nemmeli, Chengalpattu, was bountiful just 20 years ago, filled with trees, paddy crops, and rabbits. Picking brackish‑water prawns from the Great Salt Lake, a five‑minute walk away, provided income for her hamlet of about 36 Irular families. Today, this area, around 40 km from Chennai, has become dry land with weeds, prone to floods every northeastern monsoon. Residents report a drop in catch and link the changing landscape to urbanisation in Chennai, groundwater depletion, flooding, and erosion along the Kovalam coast. “When it rains, we in Kanima Nagar suffer in the floods.…

Similar Story

Information for voters in Perambur constituency

Voters in Perambur, find details about your incumbent MLA, past constituency voting patterns, and candidates this year.

Table of contentsPolitical RepresentationCandidates for 2026 pollsTop candidates2021 Polling SnapshotPrevious Results 2021Previous Results 2016Incumbent MLA:  R.D ShekarMLA profileCriminal records:MLA in the mediaKey citizen demandsAlso read Perambur is constituency number 12 in Chennai, located in the northern part of the city, and falls under the Chennai North Lok Sabha constituency. One of the largest railway coach manufacturing facilities in Asia, the Integral Coach Factory (ICF), is located in Perambur. It was established in 1955, employing thousands of workers and engineers. Key areas include the ICF colony, Perambur Barracks Road, Peravallur, Kosapet, and Kannigapuram. As per the 2011 census, the constituency has…