Why you should be watching the road-laying work closely

P Manivannan, chief project officer of State Highways Improvement Project, traces the journey of roads from simple stone-paving to asphalting. He explains why you should be watching the construction of roads in your area closely.

This is an attempt to share information about roads. Lot of information is also available in the internet, so I have taken care not to repeat the same.

So, how is a road different from regular soil surface, and why so?

Let’s take regular surface; the playground. It is fine to play when there is no rain. We can even go cycling or ride a motorbike. However, when it rains, it becomes soft and slushy. Cycle wheel or feet go deeper into the soil.

In such cases, what do we do? We place a big stone and step over it. The stone gives a hard surface. Any surface that will not get soft with water will allow us to move over it easily. So, ideally, we must be having concrete slabs as roads everywhere!

However, the concrete is costly. There must be cheaper options too. By the way, in olden days there was no concrete – it was yet to be discovered. So what did they do?

Simple! They paved the soil with stones, pressed them together to give the same effect as a single large stone. It worked! However, there was a problem. There were gaps in between the huge stones. They filled it with small stones. It helped, but it did not solve the problem fully. The small stones, under pressure, got pushed inside easily.

Then they came up with the idea of putting layers of stones. Large stones were laid deeper to withstand the weight and pressure. Over this, they put a layer of smaller stones, which gave them uniform surface. The number of layers and the size of the stones depended on the weight that will move over the road.

Binders discovered

Then there came another problem. How to keep the stone intact? The first binder was soil itself, at times mixed with lime. However, the binder used to get washed away during rains.

Then came ‘asphalt’ (bitumen) – also known as ‘tar’. Asphalt is solid or semisolid. It is heated, and mixed with stones, and then the stones are levelled using a  roller.

The bitumen acted as excellent binder. It held the stones together, and it did not get affected by water. The technology developed, but the basic principle remains the same till date. The stones are known as ‘aggregates.’

The roads are built with a slight slope so that water can drain off to the edges. Then they are collected by the drains on the sides of the road.

What if the water does not drain? It leads to two things. Firstly, any water on the road, will damage the surface, when a heavy vehicle moves on it – as it will be pressed between the tyres and the road surface with huge force, thus expelling the small weak stones in the road surface. Once a small gap comes, water will keep on seeping in and removing the stones, one by one, leading to a crater, what we call as ‘pothole’!

Secondly, if the water is not drained by the drains, it will accumulate on the sides of the roads, start seeping in, and will make the soil at the bottom loose. If that becomes loose, then it will affect the stone layer which is over it. Thus, the stone layer will start sinking in. Thus, you will see cracks or undulation in the road. That is how the roads on the wet regions, where the water table is near the surface, get undulations (bumps) very easily!

Look at the cross section of a road, in the picture below:

Cross section of a road. Pic courtesy: Facebook page of P Manivannan.

The white pieces are the stones (aggregates). The black area is the asphalt (bitumen). You can see the sizes of the stones are bigger at the bottom and smaller at the top. The topmost layer is called as ‘wearing layer’ or ‘super pave’, which keeps wearing-off, and re-laid as and when required.

Now, you understand why it’s important that the engineer keeps an eye on the contractor when every layer is made and compacted! Next time, when you see a road construction, watch it closely!

Related Articles

Resident pushes BBMP to improve shoddy process for road laying
City’s roads to be pothole-free by February: BBMP Commissioner
Building drains and filling potholes still not scientific

Comments:

  1. Santosh B R says:

    Mr. Manivannan has been an excellent bureaucrat till date. Thank him for bringing up such details.

  2. Manoj Gunwani says:

    Would be nice to have a similar article on the art and science of filling potholes!

  3. bikram bhusan satpathi says:

    Excellent pictorial breakup. Pl elaborate if POLYMER coating of small chips (also called plastics) would reduce potholes and increase life between re- laying of asphalt. It cant be all plastic coating. Some percentage of Plastic and Bitumen would create a balance. How much?

  4. Vasanthkumar Mysoremath says:

    Very good educative post for citizens who just glance at the road laying and mind their business without actually inspecting and pointing out the mistakes. Some contractors lay roads in the dead of the night and citizens just open windows, peep out and go back to sleep. In the morning they discuss with each other that the road laid is of substandard. Some of us have pointed out the faults to the concerned officers but to no avail. The contractor has the audacity to say – go and complain to anybodym U do not care. In one or two instances, they have used bad language towards us and in some cases, engineers concerned have rebuffed us saying that we do not know the technical details and the contractor has done a good job. Mr.Manivannan may like to post Part II of his article that deal with on how to combat such situations. Regards.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Ways to make the cycling track in Mumbai’s BKC more commuter-friendly

As traffic gets worse by the day in the business district of Bandra Kurla Complex, utility and need for the cycle track comes under scrutiny.

In the past few months, heavy traffic jams in the Bandra Kurla Complex (BKC) have led to suggestions of drastic measures. Mumbai’s guardian minister Mangal Prabhat Lodha has proposed that the dedicated cycle tracks at BKC be scrapped and merged with the main vehicular road to accommodate more vehicles.  This has led to much debate about the fate of the BKC cycling track, Mumbai’s first and longest stretch of planned cycling track. However, the Mumbai Metropolitan Regional Development Authority (MMRDA) is yet to officially declare its intent and whether it will act upon Lodha’s suggestion.  However, the cycling track which…

Similar Story

Rating Mumbai’s walkability: Which neighbourhood came out on top?

With its wide, tree-lined footpaths, the Dadar East route had the best walkability scores while Mahakali Caves Road was rated the lowest.

Over nine months, we at Walking Project in Mumbai hosted 25 community walks across various neighbourhoods in the city. In groups of 10–15 people, walking across different neighbourhoods, we discussed walkability, educated citizens about the guidelines which dictate the design of walking spaces nationwide, and advocated for urban planning that prioritises walking, among other topics. One of the key highlights of this initiative was the ranking system we developed for the routes we walked. During each walk, we asked participants to rate their route based on specific walkability criteria. This allowed us to create a ranking of the best and…