Metro to link Chennai Central and airport by March 2018

A look at the new connections to be provided by Chennai Metro in early 2018 as well as some key features of the currently operational lines.

Chennai Metro Rail will connect two more sections with the airport in Tirusulam-Meenambakkam by March 2018: DMS on Anna Road and Chennai Central, the city’s most important rail terminal.

With that linkage, the rail system will effectively connect suburban trains operating upto Arakkonam in the West and Gummidipoondi in the northwest, from Central. It already links the city’s central bus station, CMBT, with the airport by rail.

The timeline for the new connections was recently highlighted by an executive of Chennai Metro Rail Limited to a group of visitors, including this writer.

Connecting the premier rail head in the city, and Chennai Egmore, the secondary rail terminal and CMBT will provide a commercially viable section for Chennai Metro, while it waits to complete its delayed project on arterial Anna Road and the line to North Chennai.

About 150 metres of tunneling between Gemini (US Consulate point) to AG-DMS (click on map) is yet to be completed, holding up early operation of the entire line.

Some key points on the current operations of Chennai Metro:

  • Green Line from Nehru Park to Airport: This provides a connection from Nehru Park on  EVR Periyar High Road (Poonamallee High Road) to the Airport (20.6 km), covering Kilpauk, Pachaiyappa’s College, Shenoy Nagar, Anna Nagar East, Anna Nagar Tower, Tirumangalam, Koyambedu CMBT (bus terminal), Arumbakkam, Vadapalani, Ashok Nagar, Eekathuthangal, Alandur, Nanganallur Road, Meenambakkam Metro. The map for the line is here. Normal fare given by Chennai Metro website for the entire stretch is Rs.60. Cards get some discounts. See this page for details.
  • At the moment, only smart cards are sold for travel on the underground section, between Nehru Park and Airport. It costs Rs.10 plus the fare, so you can use it again or keep a ten-rupee souvenir if you just passing through. (It would be environmentally friendly to give the cards a five year validity, so it is not added to the waste pile).
  • Small bus link: While we wait for the connection to Central to be completed, there is a small bus on route S96 operating between Central and Nehru Park, via Egmore. It is not designed to carry baggage, so you have to think twice whether you want to take an Uber or Ola or other mode of transport up to Nehru Park, to board the train to the airport. This is a typical third world bus with narrow entrance and exit, friendly neither to people nor meant to transport passengers transferring between trains and planes. There is an Ola counter at Nehru Park, if you wish to use that in the reverse direction to Central. Another May I Help You counter for MTC route S96 is also there, but it seemed to be unmanned last week at 11 a.m.
  • Integrated tickets: Chennai Metro says it is planning to have integrated tickets between its services and those of MTC, starting with the Small Bus. Details are sketchy, and it is likely to  work using the hand-held ticket terminals used by MTC conductors.
  • Security is a big priority at Chennai Metro and all baggage is scanned, airport-style, and passengers are frisked.
  • Real Time Passenger Info: Chennai Metro also says it has successfully trialled a real time passenger information system, although there is no timeline for its availability on the CMRL Totems that are found outside the stations, or on the official app of the Metro system.
  • Step-free access: Look out for lifts at the Metro stations, since escalators don’t exist to reach the underground concourses and platforms. I have found it difficult to navigate to the lifts at the airport.`

[This has been reposted from the popular blog Straphangers United; the original post and more photos can be viewed here.]

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Chennai’s ₹697 crore electric buses: Do they serve people who need it most?

While Chennai has invested crores in cleaner buses, public documents do not show if this deployment has improved mobility in high-density wards.

When Chief Minister M K Stalin flagged off Chennai's first batch of low-floor electric buses in June 2025, the programme was presented as a major step towards cleaner and more modern public transport. The first phase alone involves acquring 625 electric buses at a reported cost of ₹697 crore. The fleet includes 400 non-air-conditioned and 225 air-conditioned buses and is being operated from five depots: Vyasarpadi, Perumbakkam, Central, Tondiarpet-I and Poonamallee. The investment is substantial. Chennai has not inducted a fleet of this size in years. The buses are low-floor, wheelchair accessible and equipped with passenger information systems, CCTV cameras…

Similar Story

Riding the Chennai Metro is a breeze, but last-mile connectivity remains a worry

Chennai needs a unified transit system to ensure seamless travel for metro commuters on either side of the journey.

Stepping off the Thirumangalam metro at 6.45 pm, the train ride seemed effortless. It was cool, fast, and on time, taking just fifteen minutes from the office. Now comes the hard part. Standing at the station exit, finding a ride home is a struggle, as I switch between three apps to book an auto. The metro feeder bus only runs every 40 minutes and has just left. By the time I reach home, the "fast" metro trip has cost an extra half-hour and ₹120 in surge-priced rides, a last-mile problem the metro itself was built to solve. This is the…