Bengaluru Master plan: Will RMP 2035 meet the fate of RMP 2015?

There was no ownership of RMP 2015= and its implementation by BDA. Citizens to be involved at all stages of the planning process and not merely at the final draft stage, feel citizens at a workshop on the Revised Master Plan.

Citizens who participated in a discussion organised by CIVIC Bangalore today vehemently called for an effective mechanism for proper implementation of the Master Plan of BDA.  The discussion was held  in the light of BDA calling for inputs from citizens to its proposed Revised Master Plan (RMP) for 2035.  

P S S Thomas, retired IAS officer and former chairman of the Advisory Committee on RMP 2015, who made the opening remarks, stressed the need for citizens to be involved at all stages of the planning process and not merely at the final draft stage.  All 30 sister organisations, such as BWSSB, BESCOM, BMTC, etc., also needed  to be involved in the consultation process, which had not happened during the drafting of RMP 2015.   

There was no Action Taken Report on BDA’s website on RMP 2015 and no analysis of what challenges were faced and how they were met during its implementation except for the cryptic statement that "challenges were experienced during the implementation".  The Advisory Committee had recommended that there should be a committee headed by the Chief Secretary to review the implementation of RMP 2015 but this had not been set up. 

As such there was no institutional arrangement to monitor implementation of the Master Plan. Thomas  also emphasised the need for civil society organisations to strengthen their own capacities for responding to the plans and for BDA to take ownership of the Plan and its implementation.  He lamented the lack of an attempt at growth with equity in the plans.

Anjali Mohan, Consulting Urban and Regional Planner, emphasised the need for building in the process of involving citizens and other line agencies of the government at every stage of the planning while submitting the Request for Proposal itself to the consultants.

The necessary finances and time-frames too for this process needed to be built into the bid.  Though training and capacity building of BDA had been undertaken during the roll out process of RMP 2015, it did not bring in ownership of the Plan and its implementation by BDA.  It was essential to ensure that RMP 2035 did not meet the same fate.  She also lamented the lack of consonance between the Structure Plan of BMRDA and the RMP of BDA and the fact that the plans of the BWSSB, BESCOM, BMTC and BDA "never talked to one another".

Anjali cited the example of Delhi Development Authority which had called for all line agency plans and consolidated them into the master plan.   She also stressed the need to break down the Master Plan into local area plans as citizens could give inputs only at the local level.

Karveer of Kalyannagar Residents’ Association lamented that without a strict regulatory mechanism for implementing the zonal regulations and building bye-laws, etc., prescribed in the Plan, it would remain on paper and Bangalore would continue to develop in a haphazard way. 

Dwarkanath of North Bangalore Residents’ Association questioned the very Constitutionality and legality of both BMRDA and BDA making plans for Bangalore when the 74th Constitutional Amendment required a Metropolitan Planning Committee with two-thirds elected representatives to make plans for the Bangalore Metropolitan Region and the local planning to be devolved to the urban local body, BBMP. Some others stressed the need to engage with the existing system while parallely working for the legal structures to be constituted.    

The lack of a system for data-base management within BDA was highlighted by others.  Vijayan Menon of the Koramangala Initaitive called on citizens’ groups to prepare a "vision document" for Bangalore within the framework of several  national policies, such as the National Vendors’ Policy and the National Urban Transportation Policy, and push for its implementation by BDA through the BBMP.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

City Buzz: Namma City most congested | Delhi air pollution fight… and more

In other news: Office space leasing up by 31% in cities, Road repair action in Delhi, Urban radar networks for weather forecasting, and more.

Namma City most congested Bengaluru is the most congested city in India, says the Traffic Quality Index (TQI), which gives a snapshot of road conditions. Bengaluru scores high above 800 in the extreme congestion category. It is followed by Mumbai (787), Delhi (747) and Hyderabad (718). Even 9,000 AI-powered CCTV cameras, from which data collected feeds into map-based services, find it difficult to develop solutions. Traffic management is daunting, especially during rush hour and the monsoons. Score: Deccan Herald Green War Room to fight Delhi air pollution A 24×7 ‘Green War Room’ to control air pollution was launched by Delhi…

Similar Story

City Buzz: Mumbai’s mobility masterplan | 5G covers 97% of cities… and more

Other news: 5,687 traffic violations hourly in B'luru | Massive expansion likely in mall space | Indian companies lead in emissions control.

Mumbai masterplan for roads Mumbai’s development authority has drafted a Rs 58,000 masterplan to build a network of ring roads that are supposed to connect all corners of the city by 2029, cutting travel time significantly.  Mumbai’s Ring Road masterplan prepared by Mumbai Metropolitan Region Development Authority (MMRDA) outlines mega road connectivity across the Mumbai Metropolitan Region (MMR) — from Vadodara, Gujarat border in the north to Alibaug in the Konkan belt of Maharashtra down South, and towards Navi Mumbai/Thane. It will set up a complex network of roads, flyovers, reclaimed coastal roads, bridges and underwater tunnels, planning to declutter and…