RMC plant causes havoc in Orlem: Concerned citizens demand immediate removal

The RMC plant has been operating in Orlem for seven months. It has been affecting senior citizens and children with respiratory issues.

We have been living in Orlem, Malad for many years now. But for the past seven months, we have been facing a dire situation due to the presence of an illegal Ready-Mix-Concrete (RMC) plant in the area. This plant has resulted in immense pollution and poses a serious health-hazard because of the cement particles. Residents have been falling sick and complaining to the authorities. Unfortunately, the government officials have shown no cooperation in addressing this problem, leaving the burden solely on the affected residents.

We have been in touch with the Assistant Municipal Commissioner, and local politicians, but have been unsuccessful in persuading authorities for the removal of the plant. The plant continues to operate beyond the permitted hours with minimal preventive measures in place. Orlem is a densely populated residential area with schools, churches, buildings, and marketplaces, making the situation even more alarming.

The BMC regulations say that industrial plant such as this one cannot be established within 200 metres of a residential area. Moreover, this plant is not captive, which means, it releases pollutants in the air, exacerbating the problem further.


Read More: Cementing resistance: Orlem citizens oppose a polluting concrete plant


RMC Plant under guise of SRA?

The RTI Application filed by Orlem Residents. Pic: Citizens of Orlem

The plant’s establishment was falsely justified under the guise of a permit from the Slum Rehabilitation Authority (SRA). However, as there are no slums in our area, this project should not have been permitted. The question arises: How did the stakeholders manage to obtain the SRA permission? It is well known that SRA permits are granted when a redevelopment project is aimed at resettling the affected population.

When we approached the BMC officials, instead of halting the plant’s operations, they suggested measures to reduce pollution, without taking effective action. The plant began operating without adequate preventive measures, clearly violating the norms established by the Maharashtra Pollution Control Board (MPCB).

The plant owners have failed to provide any assurance to the citizens of Orlem that they have adhered to all the rules and regulations. Furthermore, both the SRA and MPCB have shown negligence by failing to provide the relevant documents when requested.

In response to a Right to Information (RTI) application filed with the MPCB, the project proponents refused to furnish the permission documents and compliance details. The draft notification passed by the MPCB clearly mentions the siting criteria for the plant, stating that it shall operate inside the project premises.


Read More: Interview with Slum Redevelopment Authority (SRA): Where does the slum-free Mumbai goal stand?


The siting criteria for the RMC Plant. Pic: Citizens of Orlem

Urgent need for civic movement

We cannot keep our windows open because of the black cement. The constant presence of these particles causes severe respiratory problems. Children and senior citizens are at a graver risk with vulnerable health. In addition, there is immense noise pollution in the area, especially for societies located right opposite the plant.

Thousands of buildings are under construction in Mumbai, but granting anyone the right to install a hazardous RMC plant in a residential area is unacceptable. The provisions for Development Control and Promotion Regulation 2034 (DCPR 2034) clearly state that the structure shall be temporary for six months. Furthermore, it also says the plant shall stop its operations immediately after the stipulated period. 

We have been demanding that the RMC plant be removed from its existing location. Even if someone possesses the necessary permits for operation, it should not come at the expense of jeopardising the health and well-being of the citizens.

Given that Orlem is densely populated, all of us have been forced to suffer the consequences of this pollution throughout the day. We have been trying to mobilise support – organisational and legal – to be able to prepare and file a petition and seek legal recourse in the near future.

Hence, we kindly request the residents of Orlem to come together and assist us in our efforts for the sake of good health of our children and families.

(Writing assistance provided by Pooja Bhatia)

Also Read:

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Warnings overlooked: Mumbai floods intensify despite reports and recommendations

Years after the deluge of 26th July 2005, Mumbai continues to flood every monsoon and expert committee reports on flood mitigation lie ignored.

A day before the 19th anniversary of the 26th July deluge, Mumbai recorded the second wettest July ever. Needless to say, the city also witnessed multiple incidents of waterlogging, flooding and disruption in train services and traffic snarls. Some of the explanations for the floods included record heavy rains, climate change, inadequate desilting of drains. There were protests on the ground and outrage on social media.   Incidentally, floods — its causes and solutions in Mumbai — have been studied since 2005, when the biggest and most damaging flood struck Mumbai and claimed 1094 lives after the city witnessed 944.2 mm…

Similar Story

After long wait for landowners, construction set to begin in EVP Township

The EVP Township Landowners' Association is working to develop their 18-year-old township with support from the Tharapakkam Panchayat

For years, long-time residents of Chennai, who bought plots in a suburban township in Tharapakkam, had to endure many hardships before they could rightfully claim their land. However, they did not give up. And now, there is a glimmer of hope as the persistence of the landowners has borne fruit. The local panchayat has also agreed to extend support, so that they can build their dream homes. In 2006, EVP Housing Pvt Ltd released colour advertisements in newspapers and distributed flyers offering plots for sale in Tharapakkam. These plots would form a township known as the EVP Township, situated five…