Explainer: How Bengalureans can generate rooftop solar power in their homes

The author's home rooftop solar system was set up on February 4th afternoon, and since then has produced 355 units of electricity as of February 28th.

Global warming due to increasing carbon footprint is a major challenge to environmental sustainability. The use of fossil fuels, such as coal, for power production is among the major causes of carbon dioxide emissions. Currently, Karnataka generates 61.5% of its power requirement through thermal stations that use coal as fuel.

Though we have one of the world’s third largest solar power plants, the Pavagada Solar Park Palavalli in Tumkur district, only 0.11 % of the state’s power requirement is met through solar energy. There is, however, huge potential to generate power through large rooftop surface areas with sunshine, which is as yet untapped.

It is advisable, therefore, that homes move to an ‘on-grid solar rooftop system’. The easiest way is for homes to meet their own power needs and export the excess units to BESCOM. My home system of 2.9 KW with Tata Solar ‘Mono Perc Half cut 144 cells DCR’ panels and Growatt string inverter were commissioned and synchronised on February 4th afternoon, and since then has produced 355 units of electricity as of February 28th.

India as a responsible nation has pledged that by 2030, 40 % of its power requirement will be through renewable energy sources such as solar energy, wind energy etc. Moving to solar energy is a great opportunity for a tropical country like ours to generate low-cost power and also save the environment.

The feasibility of moving to solar energy

The one-time investment after subsidy (Rs 44,500) could be about Rs 1.8 to 1.9 lakh for a 3 kW (all-inclusive, current technology-Mono Perc DCR module) system that could generate nominally about 430 units per month. So, apart from the contribution to reducing carbon footprint, the financial returns are around 20%, per annum, through savings of the current bill.

There are, therefore, compelling reasons for every house and apartment to move to solar energy.

How to install a home solar system

Junction box for rooftop solar power.
Junction box for rooftop solar power. Pic: Kochu Sankar G

The first step is to decide on the capacity needed. For this, the following are key considerations:

  • BESCOM-approved load: You are allowed to install it on the grid system only up to your approved load capacity.
  • Monthly consumption: Decide this based on the maximum, and an average number of units per month, and plan for future needs (say additional gadgets, EV etc.).
  • Shadow-free rooftop space available: You will need roughly 100 Sq ft area / KW.

BESCOM/MNRE Empanelled Solar vendors do provide free consultations, but it is always better to cross-check once with other experts.

Power generation graphic.
Dashboard for Solar power generation. Pic: Kochu Sankar G

Read more: You too can build a sustainable home, just do as this former submariner did


Next step: Apply for the Soura Gruha Yojane (SGY) scheme on the National Portal

Residents can directly register on the National portal using the BESCOM consumer number and registered mobile number, and file an application in simple steps instantly, and upload the latest BESCOM bill.

Once that application is submitted, intimation goes to the BESCOM Divisional office to conduct the feasibility and give approval. Your BESCOM Assistant Engineer /Junior Engineer will visit your premises to inspect and upload his report within one week. If not done automatically, you may contact your local BESCOM Assistant Executive Engineer and get it expedited. Once you find it uploaded, the installation can be done.

In the portal, you may also find a list of 35 empanelled vendors, you may choose three to four of them from your neighbourhood and take quotes, negotiate with the most reliable brands with a proper price and finalise.

Once the order is placed, the vendor will work with you to take forward the rest of the processes, such as getting and uploading the inspection report, commissioning/net meter synchronisation etc.

I was interacting with BESCOM officials directly and did not have to pay any bribes at all. Our divisions AEE, AE and JE have been very upfront and enthusiastic about the project and professionally supported us. Do not get carried away by the demands of some middlemen and agents.

6 steps to follow to apply for subsidy under the Soura Gruha Yojane (SGY) scheme.
Steps to apply for subsidy under the Soura Gruha Yojane (SGY) scheme. Pic courtesy: MNRE portal

Read more: How Century Saras put sunshine to best use


Tips:

  • The vendor needs to be with you till the time the defect-free subsidy claim is made by you, and then acknowledged and accepted by the Ministry of New & Renewable Energy(MNRE).
  • The MNRE system is transparent and the portal gives you regular updates.
  • The current program as of now is open for applications till March 31 2030.
  • There are also thousands of residents who applied in 2020-21 on the BESCOM portal under the earlier scheme, which was dormant for two years, and now they can also avail of the benefits as the implementation of that scheme is also happening now, through 3 BESCOM empanelled vendors.

Also read:

Comments:

  1. SIVARAMAN HARIHARAN says:

    Appears BESCOM is slow & appears to be discouraging SOLAR ROOF TOP. They need to first practice , before they preach for others. I am trying for 2nd SOLAR SYSTEM since Nov 16th 2022, no proper response from them till date.

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Pallikaranai Marsh’s Zone of Influence: Threat or shield for South Chennai?

Pallikaranai Marsh acts as a buffer against Chennai floods. Protecting homes and ecology around it needs a proper ZoI, not weak rules.

Every monsoon, South Chennai goes underwater. The only sponge that soaks up all that rain is the Pallikaranai Marsh, yet around it, 8,619 hectares of land face severe flood risks. Despite this, the State has offered to protect only a fraction of that land.  On October 9th, the Tamil Nadu State Wetlands Authority (TNSWA) told the Madras High Court  that the marsh's interim Zone of Influence (ZoI) is just 36 survey numbers, covering 128.19 hectares. The next hearing of the case is on November 11th.  Scattered "protection"  These plots lie in bits and pieces across seven villages, from Pallikaranai to Perumbakkam.…

Similar Story

Blocked Kovalam-Nemmeli wetland channels risk disaster for South Chennai; Conservationists urge action  

Barriers built for the Mamallan Reservoir block Buckingham Canal water flow, vital to keep the wetland alive, avoid floods and sustain fishing families.

In Chengalpattu district, the main water channels of the Kovalam-Nemmeli coastal wetland, which drains a catchment of more than 270 square kilometres, have currently been blocked. Barriers that obstruct water flow have been built across Chennai's Buckingham Canal at three places: Thiruvidanthai-Vadanemmeli, near the Nemmeli-Thiruporur bridge, and Saluvankuppam. Earlier, we explored how the Mamallan Reservoir causes serious damage to the wetland’s ecology and how fishing livelihoods are affected. Field investigations by the Wetland Conservation Network have recorded the blockages preventing tidal exchange in the Buckingham Canal.           According to officials, these barriers were put up to enable construction of the Mamallan…