Invitation for the inauguration of the treated water pipeline from South City STP to Puttenahalli Lake

PNLIT is delighted to announce that a long cherished dream of seeing our neighbourhood Puttenahalli Lake brim with water will soon be a reality!

The Chairman, Karnataka State Pollution Control Board, Dr. Vaman Acharya will be formally inaugurating the pipeline to supply surplus treated water from the Sewage Treatment Plant of South City apartments (Arekere Mico Layout) to the Puttenahalli Lake tomorrow, Sunday 17th May at 10:00 a.m. 

After the pipeline was laid, a trial to check for any leakages was done earlier this month, and it seems that all is fine. We are truly grateful to the South City Management Committee and to the residents for helping us revive and replenish Puttenahalli Lake. On an average we can expect a discharge of 4 to 8 lakh litres of water every day. The treated water meets the parameters set by the KSPCB for urban reuse and will not harm the aquatic lives that the lake supports. 

Water chamber at STP                        Pipeline from STP

Left pipeline leads to the lake              Water falls into the silt trap

Water flows into the lake, Trial 3-May-2015

It is for the first time that treated water from an apartment complex will be used to fill a lake in the city. More about this project can be read about in an earlier post here

Please be a part of this milestone moment for PNLIT and the lake, by first joining us at the STP in South City at 9:45 a.m. tomorrow, and after this at the lake.

With hope in our hearts
The PNLIT Team

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Bengaluru’s Peripheral Ring Road: Traffic relief or ecological disaster?

Even as landowners contest unfair compensation, other issues persist: emissions, large-scale tree felling, and the project's alignment through lake ecosystems.

Two decades after the Peripheral Ring Road (PRR) was announced, the project is far from completion. For farmers, it has meant years of uncertainty and mounting financial losses, while residents remain unsure about the usefulness of the long-pending road development. In an earlier article, we explored how the PRR project could lead to forced migration and threaten the livelihoods of farmers. In Part 2 of the series, we did a deep dive into the manipulation of compensation options that landowners strictly oppose. However, farmers and environmentalists raise different concerns: even if the road is built, will it truly ease traffic…

Similar Story

From Kuruvimedu to Besant Avenue, how Chennai breathes unequally

Ahead of the art exhibition ‘Pugai Padam’, this photo essay captures the contrasting realities of air and the lived experiences of air pollution in Chennai.

The chimneys of the NTECL Vallur Thermal Power Station, billowing smoke, loom over Kuruvimedu in Ponneri, Thiruvallur near Chennai. Wedged between the plant and its sprawling 300-acre ash pond, the hamlet lies under a blanket of kari (coal) and sambal (ash), coating its narrow streets, colourful homes, and trees. Kuruvimedu is hard to find on Google maps, just as its namesake bird. The main road leading to this place is flanked by factories and industrial complexes, its surface riddled with potholes that make every journey dangerous for motorists.  Home to mangroves, networks of canals, and fields, Kuruvimedu once buzzed with…