Invitation for the inauguration of the treated water pipeline from South City STP to Puttenahalli Lake

PNLIT is delighted to announce that a long cherished dream of seeing our neighbourhood Puttenahalli Lake brim with water will soon be a reality!

The Chairman, Karnataka State Pollution Control Board, Dr. Vaman Acharya will be formally inaugurating the pipeline to supply surplus treated water from the Sewage Treatment Plant of South City apartments (Arekere Mico Layout) to the Puttenahalli Lake tomorrow, Sunday 17th May at 10:00 a.m. 

After the pipeline was laid, a trial to check for any leakages was done earlier this month, and it seems that all is fine. We are truly grateful to the South City Management Committee and to the residents for helping us revive and replenish Puttenahalli Lake. On an average we can expect a discharge of 4 to 8 lakh litres of water every day. The treated water meets the parameters set by the KSPCB for urban reuse and will not harm the aquatic lives that the lake supports. 

Water chamber at STP                        Pipeline from STP

Left pipeline leads to the lake              Water falls into the silt trap

Water flows into the lake, Trial 3-May-2015

It is for the first time that treated water from an apartment complex will be used to fill a lake in the city. More about this project can be read about in an earlier post here. 

Please be a part of this milestone moment for PNLIT and the lake, by first joining us at the STP in South City at 9:45 a.m. tomorrow, and after this at the lake.

With hope in our hearts
The PNLIT Team

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Flawed EIA, lost livelihoods and flood risk: What the Mamallan project destroys in Nemmeli

Replacing Chennai’s living 'coastal shield' with a freshwater reservoir destroys 16 fishing villages, bird habitats, and flood protection.

As work on the Mamallan Reservoir project is picking up pace, environmentalists and locals dread the devastation it is unleashing. The project not only threatens the fragile Kovalam-Nemmeli coastal wetland and the habitats it supports, but also poses flood risks to communities living nearby.  In an earlier article, we showed how field studies by the Suzhal Arivom team documented the damage this project will cause to the local ecology. Based on that same report, Part 2 looks at how the project impacts the daily lives and livelihoods of people in the Kovalam-Nemmeli area. The project can trigger the erasure of…

Similar Story

A reservoir for Chennai, but at what cost to the Nemmeli coastal wetland?

A Suzhal Arivom field investigation documents how the Mamallan project could irreversibly damage Nemmeli's ecosystems and affect birdlife.

A few months ago, there was widespread uproar over attempts to convert a small part of the Pallikaranai Marshland in South Chennai into multi-storey apartments. Yet today, the equally vital Nemmeli coastal wetland in Chengalpattu district faces silent destruction. Richer in biodiversity and livelihood support than Pallikaranai, the Nemmeli wetland, also known as the “Great Salt Lake,” is being converted into a freshwater reservoir by the Tamil Nadu government, purportedly to boost drinking water supply to Chennai. But the project spells disaster. Phase one of the Mamallan Reservoir project involves acquiring more than 5,000 acres of land, removing topsoil, and…