HSR residents walk to save Somasundara Palya Lake

Residents, pained by the state of Haralukunte Lake, organised a walk to demand the lake be saved. Months of inaction by BDA and state government has seen large sections of the lake encroached.

On 7th October, the HSRx Federation organised a walkathon to the Somasundara Palya lake. More than 300 residents were there to demand that the lake be saved from encroachment and restored to its natural state. The walkathon started from Somasundara Palya circle (via DHL, Smart Retail store, EB power grid, turned left near Parangipalya Road and ended at the lake.

ABiDE member Dr Ashwin Mahesh said with more problems to be fixed in our neighbourhoods, they can be solved only by increasing the number of problem solvers. Tahsildar Harishilpa, who is responsible for clearing lake encroachments also joined the walkathon and said she was happy to see such enthusiasm especially from newer Bangaloreans. She promised support with surveying the lake boundaries.

$(document).ready(function(){ $(‘.carousel .carousel-inner .item’).first().attr(‘class’, ‘active item’);});

MLA Satish Reddy also spoke briefly. He promised all help to resolve the lake issues. He said BDA should complete the work by October 20th and also said he will use his MLA funds to support this. He had agreed to look into the lake problems in an earlier meeting in March this year.

The HSRx federation has been campaigning the last few month, to save the lake. BDA had earlier instructed HSR Police to seize debris dumping lorries to prevent more encroachment. They had also promised to deploy security guards to monitor lake. BDA had also asked Tahsildar to remove encroachments, but this has not yet been done. Residents say debris continues to be dumped into the lakebed at night and illegal structures are getting built on the lakebed.

The HSR-X Federation, formed by a group of apartments in Somasundara Palya has in the past taken up activities like
1. Lobbying to solve the issue of a portion of land on 27th Main Road part of army area.
2. Clearing illegal humps in Haralur Road (towards Sarjapur)
3. Restricting heavy transport vehicles in the area
4. Clearing garbage dump spots.
5. Fixing non-working streetlights and adding new street lights.
6. Voter id drive

The federation is now working on
1. Reviving their lake to ensure self-sustenance of water in the area
2. Khata processing
3. Kaveri water connection
4. Tarring 27th main road
5. Road repairs/tarring in Somasundara Palya roads
6. Addressing garbage issues of the area
7. Making the area more safe and secure

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Environmentalists demand urgent financial and ecological audit of Kolkata’s Rabindra Sarobar Lake

Kolkata's 'green lung' is facing degradation because of a lack of maintenance and poor utilisation of funds meant for its upkeep.

Rabindra Sarobar, affectionately known as the "Lungs of South Kolkata," is at a critical turning point. As a designated site under the National Plan for Conservation of Aquatic Ecosystems (NPCA), Kolkata's living ecosystem requires dedicated protection. Authorities are not supposed to use the lake as a commercial revenue generator for municipal expenses. However, the Kolkata Metropolitan Development Authority (KMDA), as the custodian of the lake, has failed to safeguard this beautiful green oasis in the heart of the city. Many Public Interest Litigation (PIL) matters remain pending before the Kolkata High Court and the National Green Tribunal (NGT). Yet, KMDA…

Similar Story

Why Uppal is getting hotter: Dense construction and reduced green cover increase temperatures

Data from 2015-2025 reveals how rapid urbanisation has intensified Uppal's heat risks, signaling the urgent need for blue-green infrastructure in Hyderabad.

Uppal is a suburb of Hyderabad, located in the northeastern part of the city. It is known for housing landmarks like the Rajiv Gandhi International Cricket Stadium and has schools, government offices, industrial zones and commercial centres. The area experiences high temperatures due to the Urban Heat Island (UHI) effect that operates within the city limits.  Our examination of Land Surface Temperature (LST) data covered the years 2015, 2020, and 2025 and shows how heat zones have expanded with warmer areas becoming larger. In Uppal, rapid urban development has changed the thermal balance. Dense construction and fewer trees  are creating  persistent…