The economics of roads – Part 1

Vittal Mallya Road was built about five years ago. When it was built, it was proposed as a higher order of design than the roads that BBMP usually builds. The difference consists of three key elements:

  • a level and continuous footpath
  • ducting of all utilities
  • a concrete surface of uniform width

Plus some nice things like better lighting, and a little vegetation. In Tender SURE, most of these became standard, and in BBMP we improved the design by re-doing the way the storm water drains are built.

The road cost a lot of money to build. But it was a lot more use-able than the usual roads, and more or less safe from digging, since there is nothing to dig for. Any cable that needs relaying can simply be pulled out and re-introduced. And the additional expenditure was justified on the argument that a high quality road that doesn’t need to be dug up for any work would, in the long run, cost a lot less than a cheap road that is relaid again and again, and is never of good quality.

Now, with the passage of time, there is plenty of proof. Many other roads in the vicinity, as well as other important roads in the city centre, have been retarred repeatedly in the last five years, and they are STILL NOT of the same quality as Vittal Mallya road, and they will STILL NEED additional expenditure to improve them to a good standard.

There is absolute evidence now that endless tar-laying, even to alleviate a desperate situation like in Whitefield recently, is more expensive and less useful than doing the job correctly, once.

The question is – will we learn from this? Why not build 500 roads like this in the city, instead of the 50 Tender SURE roads that the government proposes in the next three years? Why not make EVERY road contract conform to these higher norms, instead of selecting only a few roads for better work? With BBMP being so cash-strapped, and the state government virtually at the limit of its borrowing rights, it is critical that we spend every rupee right. 

Related Articles

What’s this Tender SURE all about?

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Cycle city no more? Audit reveals only 11% of Pune’s roads pass the test

Pune is set to host the 2026 Grand Tour, but a Parisar audit reveals unsafe, narrow, and encroached cycle tracks across the city.

Children and adults pedalling to school, work and play — this was a common sight on Pune's streets not so long ago. Once known for its vibrant cycling culture, the city still has many groups and communities that promote non-motorised transport. However, with the rise of motorised vehicles, cycling has not only taken a back seat, but has also become unsafe and inconvenient due to poor infrastructure. This is despite Pune having dedicated cycle tracks and lanes. The decline in cycling infrastructure is reiterated by a recent audit, which found that only 11% of cycle tracks in Pune fell in…

Similar Story

Why accessibility remains elusive at Bengaluru’s bus stops and terminals

Our reality check of the city's major bus stops revealed that most do not adhere to MoRTH guidelines, excluding persons with disabilities.

Bengaluru is racing to bridge the gap between first-mile and last-mile connectivity in public transport, but for people with disabilities, the journey is riddled with obstacles. Inaccessible bus stops and terminals in the city keep them excluded. “I have been travelling on muscle memory alone. There are no supportive facilities or infrastructure in bus stops or terminals,” says Mohan Kumar, a visually-impaired person who has been commuting in Bengaluru buses since 2012.  The exclusion starts at the bus stop. “Even if buses are inclusive, it is nearly impossible to reach the bus stops in Bengaluru due to poor design and…