Zone Snapshot: Wards- 94, 95, 96, 97, 98, 99, 100, 101, 102, 103, 104, 105, 106, 107, 108 Population- 757273 (2013) Polling Stations- 572 To locate your polling station – https://tnsec.tn.nic.in/tn_election_urban2021/find_your_polling_station.php To locate your ward and zone – https://chennaicorporation.gov.in/gcc/citizen-details/location-service/find_zone.jsp Issues in the Zone: In January of 2021, the waste collection in 11 out of 15 zones were handed over to private companies. Zone 8, was one of the zones where a waste collection contract was handed to Ramky Enviro Engineers (a private envrionmetal services company). The company absorbed around a 100 workers, and the rest (who were employed under the…
Comments:
Leave a Reply
Similar Story
Local body polls in Adyar, Zone 13 : Wards, candidates and issues
Zone snapshot Wards -170, 171, 172, 173, 174, 175, 176, 177, 178, 179, 180, 181, 182 Population - 490767 (2013) Number of polling stations - 471 To locate your polling station - https://tnsec.tn.nic.in/tn_election_urban2021/find_your_polling_station.php To locate your ward and zone - https://chennaicorporation.gov.in/gcc/citizen-details/location-service/find_zone.jsp Issues in the zone: Traffic congestion at Madhya Kailash Junction is a key issue that affects commuters. Those looking to travel to the airport or southern parts of the city face long hours of commute during peak hours in the area due to traffic jams. Overflowing sewage and old sewage pipes are an issue in Adyar. The old pipes leak…
Asphalting of Ramaiah Hospital to outer ring road (shown in yellow) has not been done and the road is in bad shape.
Mr Ayyangar, the ones in yellow are being done in the first phase – you should see some traction in the next few weeks.
Hmmm…
Unable to find my road in this list. “ORR to chinnapanhalli railway gate.”
We had informed the BBMP commissioner about the road conditions a few months back (Aug/Sept time frame)
When the mayor published his mail ID and asked for public grievances we wrote to him and got a tracking number in return….
We have a
Suranjandas road in entirety.From Old Madras road all the way up to Airport road.Its been 2 years no progress.
Ah that explains the asphalting work I noticed in Jayanagar yesterday.
I have experienced a few of these roads newly resurfaced. Makes huge difference in the flow of traffic. Hope they can do ITPL junction near SAP; so bumpy takes everyone ages to get thru.
Wondering why this has all taken so long to fix the roads in the first place?
I have noticed in recent times that BBMP and BDA have stopped the design of installing/erecting new street lights in between the double road though the roads are wider enough, which is widely followed method in every urban place in the country.
Instead BBMP is erecting each street light on left sides of the opposite roads.
The reason for disadvantage are mentioned below:
1.The lights reflection is weak because the lights are being covered by the surrounding trees and their branches.
2. Increase in cost of erecting two light poles on the both side of the road rather than One street pole in between the road on the median.
3. Erecting the pole in between provides more light reflection for vehicle commuters hence avoid accidents during night time.
4. Last but not the least, it adds to the beautification of the road and the method is of International Standard.