Lows and highs of laving a lake full of water!

A dry for years lake finally looks like a proper water body. Ever since we took up the cause of Puttenahalli Lake over seven years ago, this had been one of our goals – to see the entire lake bed submerged.

20th May 2014

6th June 2015

For over a year, excess treated waste water from the STP at South City Apartment Complex is being discharged into the lake. This has percolated and saturated thoroughly the earth below before showing up on the surface. The rain water added to this increasing the level to an unprecedented height.

While we were taking it all in, total strangers came up to us and expressed their delight. We were elated but what ran in our heads was a new concern, a new challenge – how do we keep the water clean?

We need to pluck out new shoots of the alligator weed from the water. Remove at once the plastic bags of Puja offerings and bottles that the insensitive manage to fling over the grill before our guys can stop them. The fisherman we had engaged to remove the invasive weeds in April is unable to get workers willing to work in the cold water. By the time the water warms up, would the weeds have grown wild once again? Or will the fish that are thriving, indeed jumping in and out of the water merrily, eat the young shoots quickly enough?

After a heavy downpour the previous evening, we saw just this. A marvellous sight on World Environment Day, Sunday 5th June. From one end to the other, from this side to that, there’s water, water everywhere at Puttenahalli Lake!

 

6th June 2016

The rain did not only fill the lake. It also dissolved the nutrients in the water. Unfortunately, on 27th May a sewage chamber on Nataraja Layout had collapsed and the contents had gone straight into the lake gathering along the way all the plastic and trash in the drain. Fortunately, they were contained within the wetland. We had contacted BWSSB immediately and JE Mr. Nagaraj attended to it. By the time he got it repaired, however, sewage had been flooding the wetland for four days and nights.

We hoped that the heavy rains over the next few days would dilute the sewage and reduce the damage it can do to the quality of the water. But with the increased level the trash floated higher and higher. The boulders forming the wetland is about seven feet high but now at some points it is less than half a foot above the water.

To make matters worse, the sewage chamber collapsed once again on the night of 5th June! The heavy traffic had not allowed the fresh cement on the new manhole to cure properly. People had removed the obstacles placed on the road and gone over the manhole cover breaking it. As if this is not enough, according to BWSSB Nagaraj, people living on either side of the road diverted the rain water from their homes into the sewage line adding to the load. He got it repaired yet again but this time we were wiser. One of our well wishers, Srinivas Alavilli spoke to the Hulimavu traffic police and got a man posted to divert traffic, With this, we hope that we have solved at least one problem, for the present.

Now we had to tackle the danger of the muck flowing over the stones of the wetland into the main lake which we had got cleaned in April with such difficulty. Neither BWSSB nor BBMP was able to get workers at such a short notice.

But our two gardeners came to the rescue. Together with the BBMP contractor’s man assigned to our lake, Jayanna and Ramu entered the stinky cesspool in a coracle and using long handled rakes pushed the floating garbage to a side from where they brought it out of the water. We paid them for this of course but it was hardly any compensation for the relief it gave us. We’d managed to prevent the bulk of the plastic waste from polluting the lake. Truly, with success comes greater responsibility.

Sewage overflowing on the road

Trash in wetland

Trash removed from wetland

In our lake chronicles, this is the “low” of having water in the lake. Look out for the exciting “highs” soon to follow!

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Buckingham Canal restoration: Stuck between ambitious proposals and financial constraints

Buckingham Canal in Chennai, vital for flood control and ecology, faces neglect, pollution and halted restoration due to funding challenges

It has been over two centuries since the construction of the Buckingham Canal, a once vital navigational route stretching from Pedda Ganjam in Andhra Pradesh to Marakkanam in Tamil Nadu. At its peak, the canal could carry 5,600 cubic feet per second (cusecs) of water. However, decades of unplanned urbanisation have drastically reduced its capacity to just 2,850 cusecs with the Mass Rapid Transit System (MRTS) being the major encroacher. Map: Shanthala Ramesh Regular desilting is crucial for maintaining the Buckingham Canal, yet its upkeep has been a significant challenge since the early 20th century. Over the years, numerous proposals…

Similar Story

Panje wetlands: Greens continue their fight against all odds

Despite a long struggle by environmentalists, the Panje wetlands in Uran are drying up. A look at the reasons for this and what activists face.

“Panchhi nadiya pawan ke jhonke, koi sarhad na inhe roke…”  (Birds can fly where they want/ water can take its course/ the wind blows in every direction/ no barrier can stop them) — thus go the Javed Akhtar penned lyrics of the song from the movie Refugee (2000, J. P Dutta). As I read about the Panje wetlands in Uran, I wondered if these lyrics hold true today, when human interference is wreaking such havoc on natural environments, and keeping these very elements out. But then, I also wondered if I should refer to Panje, a 289-hectare inter-tidal zone, as…