Info for voters of Malleshwaram Constituency – MLA, Candidates, Voting and more

If you are one among the lakhs of voters of Malleshwaram, this is what you need to know!

Background information

Incumbent MLA: C.N Ashwath Narayan

List of Candidates, 2018

Candidate

Profile/Track Record

C.N Ashwath Narayan

Bharatiya Janata Party

  • Family: Wife, 2 children
  • Profession: Doctor/MLA
    • MD of Padmashree Medicare Pvt Ltd
    • MD of Padmashree Charitable Trust
    • MD of Sushrutha Group of Institutions
    • Senior vice-president of the Karnataka State Athletics Association
  • Education: MBBS
  • Online:
  • Number of pending criminal cases: NIL
  • Net worth (2018):
    • IT Returns: 5.59cr+57.54 cr(spouse)
    • Movable Assets: 24.73cr+15.81cr(spouse)+2.27Lacs+15 Lacs
    • Immovable Assets: 3.62 cr+ 13.73cr
    • Liabilities: 12 Lacs+ 1 cr 9 Lacs (spouse)

Kengal Shreepadharenu

Indian National Congress

  • Family: Wife, 1 dependent
  • Profession: Businessman
  • Education: B.E.
  • Online:
  • Number of pending criminal cases: NIL
  • Net Worth (2018):
    • IT Returns: 9.95 Lacs (spouse)
    • Movable Assets: 1.55cr+1.81 cr(spouse)
    • Immovable Assets: 5.10cr+ 2.58cr (spouse)
  • Ex-Assistant Commissioner of Central Crime Branch
  • Brother of Congress General Secretary BK Hariprasad
  • First-time contestant
  • Recipient of President’s Medal for Meritorious Service in 2001

Madhusudhan N

Janata Dal (Secular)

  • Family: Wife, 1 dependent
  • Profession: Advocate
  • Education: BA LLB
  • Online: no details
  • Number of pending criminal cases: NIL
  • Net Worth (2018):
    • IT Returns: 9.47Lacs
    • Movable Assets: 16.99 Lacs+ 9.32 Lacs (spouse)
    • Immovable Assets: 3.12 cr
    • Liabilities: NIL  

Full List of Candidates

[embeddoc url=”http://data.opencity.in/Documents/Recent/Karnataka-Assembly-Elections-2018-Candidates-AC-157.pdf” width=”100%”  download=”all”]

Previous Results

2013 candidates

Party

Votes

Age

Vote Share

C. N Ashwath Narayan

BJP

57609

45

53.19%

B.K Shivaram

INC

36543

60

33.74%

Dr. Meenakshi Bharath

LSP

7610

55

7.03%

 

2008 candidates

Party

Votes

Age

Vote Share

C.N Ashwath Narayan

BJP

53794

40

52.13%

M.R. Seetharam

INC

45611

52

44.2%

M.Shankaranna

JD(S)

2291

62

2.22%

About Malleshwaram:

[flexiblemap src=”http://data.opencity.in/Data/Karnataka-Assembly-Constituency-157.kml” width=”100%” height=”400px” ]

Situated in the north-western locality of the city, Malleshwaram’s name was derived from the Kaadu Malleshwara temple. The area began to be developed after the great plague of 1898. Malleshwaram Constituency comprises Rajamahal, Guttahalli, Kadu, Malleshwaram, Subramanya Nagar, Gayithri Nagar, Aramane Nagara and Mathikere wards.

The constituency was once dubbed the ‘Tamil-Kannada-Konkani Brahmin’ stronghold. The sweeping, gentle boulevards, named after flowering trees, such as Mallige, Sampige and Margosa, have yielded way to a more cosmopolitan environment today with even a materialistic touch, due to the construction of malls, flats, stadia and gyms. However, with increasing growth and commercialisation, the constituency faces a number of problems, such as police harassment, a deteriorating infrastructure pressure, poor traffic management and parking issues.

Malleswaram is called the “thinking man’s constituency and is reputed for its ‘literate’ voters, so politicians are wary about making tall and false promises here. Activists in this constituency have always been vociferous.  As far back as in the 1990s, a theatre complex plan was stopped as residents feared that it would encroach Sankey Tank. Recent protests prevented the BBMP from cutting down trees to broaden Sankey Road. Currently, residents are opposing a commercial apartment complex plan that is being built in forest land nearby. On the other hand vendors, who have been evicted from a 100-year-old marketplace, are pressuring the same builders to speed up their work so that they can get back their space.

  • The total number of votes cast in 2008: 1,03,218.
  • The vote share in 2013: 1,08,304.
  • The number of registered currently: 2,13,528.

 

Comments:

  1. R.Ramdas says:

    Voting booth for malledwaram?

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Fishers of Thiruvanmiyur Kuppam: Aborigines of the coast, not ‘Beach Grabbers’

Fishers of Chennai's Thiruvanmiyur Kuppam challenge encroachment claims, defending their long-standing rights amid coastal development.

The dispute between the fishermen and the more affluent, non-fishing residents of Thiruvanmiyur and Besant Nagar has simmered for years, highlighting tensions over land use, development, and livelihoods. Acting upon the complaint from the residents (non-fishers) in the locality, the GCC demolished the temporary constructions made by the fishers of Thiruvanmiyur Kuppam in June this year. Being less than 40 metres from the coastline, they were termed encroachments. A mainstream news outlet even referred to fishers' construction as ‘beach robbery,’ emphasising concerns that the illegal construction of houses and pathways could lead to the loss of turtle nesting sites and…

Similar Story

Bellandur Lake rejuvenation: An urgent call for action

Citizens have strongly disapproved the slow progress on Bellandur Lake's rejuvenation project. Immediate intervention is needed to avoid failure.

Bellandur Lake, Bengaluru’s largest water body, has been at the heart of an ambitious rejuvenation project since 2020. However, persistent delays, severe funding shortages, and inadequate planning have left citizens increasingly frustrated. Time is slipping away, and without immediate government intervention, this critical environmental project risks failing. A recent meeting with government bodies shed light on the project’s stagnation and the urgent steps required to salvage it. Progress so far Desilting Work: Of the estimated 32.33 lakh cubic meters of silt, 22.69 lakh cubic meters (70%) have been removed, leaving 30% unfinished Early monsoons and slushy conditions have delayed progress…