Collection racket at NICE road toll booths

On the NICE Road, I have been recently noticing people (apparently employed by those who collect the tolls) who approach cars stuck in the queue, asking if they want to pay the toll to them and not have to stop at the toll gate. The hidden agenda? They charge higher amoounts than the official toll. Eg, the toll that we were supposed to pay was Rs.52, but these people asked us to pay Rs.60. If they charge so much extra per car at times of heavy congestion,not only are they fleecing motorists, but they are also contravening the law.

here

 

Is the link to a page where, if you scroll down,you can see the image of the notificiation which says that if the traffic queue exceeds a certain length, the toll operators should clear the congestion by allowing vehicles through without collecting the toll. The actual words are: As per circular no. NHAI/CO/04/2016 by NHAI At every toll plaza 100 meter ahead from collection booth should have a red line. If the traffic in que crosses this line, you can approach the booth and ask the barrier to be opened without toll collection. And this is a given directive to all NHAI toll Booths for traffic smoothness.

Here,

is the link to the detailed image.

 

Contrary to this, toll booth operators are actually trying make more money out of high-traffic occasions.

Surely, the NICE Road toll collectors are also bound by this law, which I do not see enforced on National Highways, either.

I trust that this pernicious practice will be stopped immediately.

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Chennai’s ₹697 crore electric buses: Do they serve people who need it most?

While Chennai has invested crores in cleaner buses, public documents do not show if this deployment has improved mobility in high-density wards.

When Chief Minister M K Stalin flagged off Chennai's first batch of low-floor electric buses in June 2025, the programme was presented as a major step towards cleaner and more modern public transport. The first phase alone involves acquring 625 electric buses at a reported cost of ₹697 crore. The fleet includes 400 non-air-conditioned and 225 air-conditioned buses and is being operated from five depots: Vyasarpadi, Perumbakkam, Central, Tondiarpet-I and Poonamallee. The investment is substantial. Chennai has not inducted a fleet of this size in years. The buses are low-floor, wheelchair accessible and equipped with passenger information systems, CCTV cameras…

Similar Story

Riding the Chennai Metro is a breeze, but last-mile connectivity remains a worry

Chennai needs a unified transit system to ensure seamless travel for metro commuters on either side of the journey.

Stepping off the Thirumangalam metro at 6.45 pm, the train ride seemed effortless. It was cool, fast, and on time, taking just fifteen minutes from the office. Now comes the hard part. Standing at the station exit, finding a ride home is a struggle, as I switch between three apps to book an auto. The metro feeder bus only runs every 40 minutes and has just left. By the time I reach home, the "fast" metro trip has cost an extra half-hour and ₹120 in surge-priced rides, a last-mile problem the metro itself was built to solve. This is the…