Proposal for a cheaper, efficient Metro line on Inner Ring Road

The IRR line, if built, could achieve a 77% increase in Metro’s ridership. Bengaluru citizen Lohith Kumar proposes an efficient layout

The Bengaluru Metro Rail Corporation (BMRC) proposed the Inner Ring Metro (IRM), a fully underground 34-km-long metro line to be completed by 2031, as phase 3 in the Comprehensive Mobility Plan of 2019. IRM would comprise 23 new metro stations and six interchanges, considering the completion of all other phases of the metro project. This line was suggested as it connects all major commercial and educational hubs, which might help reduce traffic congestion at the city level.

Indian Institute of Science (IISc) Transportation Research Lab evaluated this Metro line proposal in February 2020. In a report, they concluded that the IRM can achieve a 77% increase in Namma Metro’s ridership by 2030, and take the network length up to 203 km. The report further concluded that with the IRM, there could be a decrease of 14% in Vehicle Kilometers Travelled, a decrease of 11% in fuel consumption, along with a 9% increase in Non-Motorised Transport (NMT) trips, which meant a decrease of 4% in emissions each year.

2020 Report from Indian Institute of Science (IISc) Transportation Research Lab:
Ridership Estimation and Evaluation of the Proposed Inner Ring Metro Corridor in Bengaluru City, Authors: Ashish Verma, Harsha V, Hemanthini A R


Read more: “Namma Metro till Silk Institute saves me Rs 10,000 a month”


Lohith Kumar J C, an engineer who tracks infrastructure projects in the city, wondered why the project was not being taken up despite so many benefits. He has been studying this route since the time it was proposed, and felt BMRC was only prioritising other lines in Phase 3 – JP Nagar to Hebbal (along the Outer Ring Road) and Magadi Road Tollgate to Kadabagere.

Bengaluru Inner Ring Metro (IRM) proposal by Lohith Kumar
Proposed Inner Ring Metro (IRM) line. Image Courtesy: Lohith Kumar

Lohith worries that by delaying the execution of the IRM, BMRC might lose the land parcels to developers, which would make the Metro costlier at a later date. Also, since building a completely underground network costs three times as much as building an elevated network, the proposal might get shelved by the government. And the city will lose out on the traffic and productivity benefits determined by IISc. He points to the lost opportunity at Koramangala, which now has an elevated road corridor instead of a Metro line.

So, Lohith took it upon himself to study the alignment. He drew up maps to show where the stations and lines could come up over ground, in order to reduce cost and make the project attractive for BMRC to take up on priority. He proposes a line with 21 stations, of which six are underground, 11 elevated, and four either elevated or underground. That is, almost half the stations identified are elevated. They are also next to government entities, so the acquisition costs can reduce. He has identified possible approach/retract locations, and also recommends integration with other Metro lines to ensure seamless connectivity.

No.StationInterchange stationStation typeStation LocationDistance from previous station (km)
1TollGate1) Hosahalli (Phase 1)
2)Tollgate [Magadi Road to Kadabagere] (Ph 3)
UndergroundPrameelabhai Mane BBMP High School2.6
2Dhobi Ghat JunctionNAUndergroundBESCOM Rajajinagar, West of Chord Road1.6
3ISCKONMahalakshmi (Ph 1); Connect with skywalkUndergroundKamalamma Gundi (KG) Ground (or) ISKCON Temple Parking2.6
4Yeshwanthpur TTMCSandal Soap Factory (Ph 1);
Connect with skywalk
UndergroundKarle Exports and Gopal Theatre1
5SadashivanagarNAUnderground/ ElevatedCPRI Campus, Yeshwanthpur – Mekhri Circle Road2.1
6Mekhri CircleNAUnderground/ ElevatedPalace Grounds, Jayamahal Main Road1.1
7JC NagaraNAUnderground/ ElevatedFunitureworld ground, Opp. Snow City Jayamahal Main Road1.5
8CantonmentNAElevatedKings Crest apartments, Millers Road, Jayamahal1.7
9Government LibraryBamboo Bazar (Ph 2);
Connect with skywalk
ElevatedGovernment Library, Millers Road1.1
10Ulsoor LakeNAElevatedKensington Gardens, Murphy Road2.6
11BDA ComplexNAElevatedBDA Complex Indiranagar, Swami Vivekananda Road1.5
12CMH ParkIndiranagar (Ph 1);
Connect with skywalk
ElevatedCMH Park Indiranagar, Intermediate Ring Road1.1
13DoopanahalliNAElevatedDoopanahalli Bus Stop, Intermediate Ring Road1.7
14Embassy Golf Link (EGL)NAElevatedEGL Gate, Hero Honda Stop, Intermediate Ring Road1
15KoramangalaNAElevatedSt.John’s Medical College Sports Ground, Near St. Johns Hospital Madiwala Junction5
16Forum MallNAElevatedForum Mall, Hosur Main Road1
17Dairy CircleDairy Circle (Ph 2)ElevatedITI College (or) Dharmaram College, Hosur Main Road1
18Wilson Garden
(Optional)
NAElevatedLalbagh Siddapura, Siddapura Road, Near Karumariamman circle1.6
19Teachers CollegeLalbagh (Ph 1);
Connect with skywalk
Underground/ ElevatedTeachers College Circle, Opposite RV Teachers College2.8 / 1.7
20Bull Temple / BMS CollegeNAUndergroundBugle Rock Park, Opposite BMS College for Women1.3
21KempambudhiNAUndergroundRajiv Gandhi Sports Complex2.3
Stations on IRM, proposed by Lohith Kumar

Click here to view Lohith Kumar’s full proposal.

Also read:

Comments:

  1. Raja says:

    Pls no more metro trains . Decongest city . Hard earned tax payers money wasted on it. Instead have a circular tram or railway much cheaper. Metro too expensive and very less users.

  2. Venkat says:

    Traffic issues in some roads will automatically reduce if HAL airport opens, It will.resuce pollution and save millions of barrels of petrol/diesel and commute time for many travellers.

  3. Nihar says:

    The IRM and Carmelaram – Yelahanka lines are great proposals which need to be implemented in phase 3. It’s really unfortunate that the state is only considering ORR-West and minor extensions around it.

  4. JK says:

    This will be an awesome addition to BMRCL! I hope this gets traction with the authorities

  5. Lohith says:

    BMRCL should consider Inner Ring Metro (IRM) under Phase-3

  6. Jishnukrishna Venkat says:

    Colour of the Line ? Is it Red ?

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Are Chennai’s bus stops and terminals truly accessible? A reality check

On World Disability Day, we examine how MoRTH guidelines expose gaps; Chennai bus stops still fail persons with disabilities in basic accessibility.

Fifty-five-year-old Gnana Bharathi, a scientist at the Central Leather Research Institute and a wheelchair user for over two decades, rarely takes the bus anymore. Chennai’s bus stops and termini, he says, are designed in a way that makes independent travel “nearly impossible”— from reaching the stop safely, to getting onto the platform and finally boarding the bus — without physical risk. So, when the Greater Chennai Corporation declared the Vivekananda House Bus Stop on Kamarajar Salai as an accessible, ‘model bus stop’, he decided to try it.“When I arrived at the location in my wheelchair, I couldn’t even access the…

Similar Story

Mumbai’s transport overhaul: Real solutions or a hidden agenda?

The proposed Metro 11 project seems to focus on real estate gains while causing environmental damage and ignoring the needs of commuters.

Maximum City, Glamour City, City of Dreams, City of Struggles — Mumbai wears many names and identities. One of the world's most populous cities, it houses a staggering 2.17 crore people in just 603 square kilometres. Its carrying capacity in terms of accommodating a workforce was exceeded a decade ago, yet the daily inflow continues. Sky-high, artificially inflated real estate prices have pushed many to the distant suburbs, making the daily commute for work or study an arduous struggle. And yet the mobility solutions that the city administration and other powers that be come up with are not only inadequate,…