What do the various party manifestos promise us? A bird’s eye view

With two days to go, let us take a quick look at what the various parties have promised for Bengaluru in their election manifestos

Bengaluru & Infra & Urban Planning

INC

  • Pitching Bengaluru as the Second capital city of India.
  • A special package of 100,000 crore for infra
  • Compile a new survey map of the city to subsume all the underlying historical village maps

BJP

  • Pass a new law named the “Nava Bengaluru Act” to cater to the unique needs of Bengaluru.
  • Institute Bengaluru Transit Challenge Fund with a Rs 200 Crore initial corpus to incentivise citizen driven transit.
  • Develop Devanahalli town as an IT city by taking advantage of its proximity to the Bengaluru Airport.
  • Transform all metro pillars and flyover into standing gardens.
  • 5000km of strategically designed footpaths for optimum space utilisation and pedestrian friendly infrastructure; disabled-friendly footpaths

JDS

  • Replacing KTCP Act by Karnataka Urban and Regional Planning Act in cities and towns of Karnataka.

AAP

  • Increase open spaces to 40% in all urban areas.
  • Construct one public toilet per 500 homes

Governance

INC

  • Better management of municipal corporation with a Greater Bengaluru Authority.
  • Establish an Ombudsman to ensure that citizens get better services.
  • Create a city finance commission
  • In 10 years time, a directly elected empowered mayor system
  • A continuous updating of all government websites
  • Every government rule, policy and scheme will be sent via SMS to all the ci zens of the state
  • Corporator will not have veto power over citizen decisions

BJP

  • Setup a city economic development agency.
  • Build and maintain a city spatial data centre.

JD(S)

  • Restructuring of parastatal organisations including the BWSSB, BDA and BMRDA.

AAP

  • Elections of all local bodies to be held on time
  • No supersession of local bodies by the state government

Water/ Lakes / Storm Water Drains/ Sewage 

INC

  • Expediting the Cauvery V Phase Proposal to augment drinking water supply to Bengaluru City, Bengaluru Rural and Ramanagaram
  • Promoting and implementing the Anna Hazare Model for water sustainability and rejuvenation of water
  • Introducing new projects to provide drinking water by implementing the Sharavathi & Mekedhatu – Yethinahole model
  • Decentralised wastewater treatment.
  • Recharge open wells

BJP

  • Rs 2,500 Crore Nadaprabhu Kempegowda fund sanctioned for cleaning, revival of lakes and rivers, ridding the city of water mafia.
  • Nadaprabhu Kempegowda Lake Conservation and Rejuvenation Fund: BLCDA will be a regulatory body for protection of lakes, rajakaluves and storm water drains.Rs. 2500 crores will be allocated to the revival of the ecosystem.

JD(S)

  • Solid waste management will be done through legislative, technical and operational measures.

AAP

  • BWSSB and KUWS&DB to accept responsibility for every building 20,000 kms per family of lifeline water free each month
  • Installing 10,000 new open wells in Bengaluru.

Solid Waste Management

INC

  • Decentralised solid waste management in every ZP area.
  • Constructing local waste handling and processing units within zones and assembly constituencies.
  • Penalising burning of garbage.
  • Construct 20 MW Decentralised Biomass Gasification Power Project in every district.

BJP

  • Recycling of 100% of sewage generated in the city.

JD(S)

  • Solid waste management will be done through legislative, technical and operational measures.

Roads / Traffic Management / Mobility

INC

  • Expand coverage of TenderSURE roads.
  • Complete white topping of major roads throughout Bengaluru City.
  • Build more flyovers and execute road widening exercises.
  • Plan underground lanes to decongest traffic similar to the Delhi underground lines.
  • Consider opening suburban railway links to destinations up to 100 kms from the city centre.
  • Introduce innovative solutions to utilise space available below metro line and elevated roads for parking vehicles.
  • 25% of the buses will be air conditioned and 30% of passengers use public transportation.
  • 2000 kms of walkable footpaths

BJP

  • Pedestrians will cross at grade within the city centre and skywalks will be restricted to major arterial roads on the outskirts.
  • Incentivise use of public transport by offering reasonable fares.
  • Setup and fund Unified Metropolitan Transport Authority (UMTA) to introduce more mobility initiatives.
  • Expand BMTC fleet and reduction of fares by 50% for long journeys to benefit those in the unorganised sector
  • Bruhat Bengaluru Suburban Rail: implementation of Rs.17,000 BBSR project
  • Green Bengaluru 1:1 – tree census, identification of planting sites and planting saplings to bring the tree-to-person ratio to atleast 1 in Bengaluru

JDS

  • City Mobility Plans will be prepared for all district headquarters and corporation areas of the state

AAP

  • Local, community-managed parking permits in neighbourhoods
  • Providing 120 buses per lakh of population in all urban areas.
  • Cycle lanes around all major lakes (also to stop encroachment)
  • Rapid construction to build flyovers / underpasses in 6 weeks

Environment

Congress

  • Execute best water-management practices such as bio-retentions, dry and wet ponds, and porous pavement Increasing open public spaces by 2% every year.
  • Make the WHO standards for air and water quality as our goal.
  • Installation of solar panels on the rooftops of all government buildings.

BJP

  • Green Bengaluru 1:1 – tree census, identification of planting sites and planting saplings to bring the tree-to-person ratio to atleast 1 in Bengaluru
AAP
  • Native species only in all tree planting
  • At least one air quality monitor in every ward

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Fishers of Thiruvanmiyur Kuppam: Aborigines of the coast, not ‘Beach Grabbers’

Fishers of Chennai's Thiruvanmiyur Kuppam challenge encroachment claims, defending their long-standing rights amid coastal development.

The dispute between the fishermen and the more affluent, non-fishing residents of Thiruvanmiyur and Besant Nagar has simmered for years, highlighting tensions over land use, development, and livelihoods. Acting upon the complaint from the residents (non-fishers) in the locality, the GCC demolished the temporary constructions made by the fishers of Thiruvanmiyur Kuppam in June this year. Being less than 40 metres from the coastline, they were termed encroachments. A mainstream news outlet even referred to fishers' construction as ‘beach robbery,’ emphasising concerns that the illegal construction of houses and pathways could lead to the loss of turtle nesting sites and…

Similar Story

Bellandur Lake rejuvenation: An urgent call for action

Citizens have strongly disapproved the slow progress on Bellandur Lake's rejuvenation project. Immediate intervention is needed to avoid failure.

Bellandur Lake, Bengaluru’s largest water body, has been at the heart of an ambitious rejuvenation project since 2020. However, persistent delays, severe funding shortages, and inadequate planning have left citizens increasingly frustrated. Time is slipping away, and without immediate government intervention, this critical environmental project risks failing. A recent meeting with government bodies shed light on the project’s stagnation and the urgent steps required to salvage it. Progress so far Desilting Work: Of the estimated 32.33 lakh cubic meters of silt, 22.69 lakh cubic meters (70%) have been removed, leaving 30% unfinished Early monsoons and slushy conditions have delayed progress…