Let the trees be

A design proposal from Vijay Narnapatti to widen Sheshadri Road without cutting the roadside trees is an attempt at a constructive engagement between a citizen and the government.

On 12th November 2008, Hasiru Usiru (HU) volunteers, in a symbolic act of protection, tied white ribbons around the trees on Sheshadri Road. The road is slated to be widened, with several 40-50 years old trees along its strength to be felled.

Design proposal

Vijay Narnapatti (far left) engaging the members of the Empowered Committer in discussion (12 Nov 08, Sheshadri Road)
(pic: Deepa Mohan)

As Chairman, Yellappa Reddy, of the Empowered Committee, himself turned up for the inspection of the road, he was met by Vijay Narnapatti, an architect and a HU volunteer. Naranpatti pressed for the cause of retaining as many trees as was possible, and reiterated that road-widening was, at best, only a short-term solution. Reddy countered that as a lane with a depth of 1.5 metres would be dug, the roots of the trees would be weakened anyway; it would be better if all the trees were removed at the outset. Also, he said that since all the trees were not in a linear alignment, preserving all of them would be difficult. The space would be allocated for footpaths of 3 metres on each side of the road, apart from a two way road with six lanes of traffic, he added.

Narnapatti also pressed for the need of a dedicated cycle path, keeping in view the number of educational institutions in the area. He offered to give a design for one from Sheshadri Road to Jayanagar as a first step in the direction.

Click here for the complete design proposal from Vijay Narnampatti.

Synchronization of traffic lights was also mooted, and Reddy asked HU to submit a proposal for the same for the Committee’s consideration.

Tree Officer, Suresh, signed the design proposal letter for Sheshadri Road to be submitted by Naranpatti and also acknowledged the document with analysis of the situation on Sheshadri Road and Naranpatti’s solutions for it.

Addendum
On November 29th, the volunteers of Hasiru Usiru got together with several like-minded citizens to congregate on the steps of the Puttanna Chetty Town Hall, holding up placards and once again re-iterating that the roads of Bangalore were not meant only for motorized transport, but were meant also for children, the elderly, the disabled, the cyclists, the pedestrians, and even for the vendors who eked out their livelihood there.

The strength of the turnout was greatly augmented by the presence of large numbers of Avenue Road shopkeepers, who see their businesses being badly affected by the widened roads and the increased traffic. Several cyclists of Bangalore also joined the gathering, and spoke out about the way they feel marginalized by the present road-widening plans of the BBMP.

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Chennai’s ₹697 crore electric buses: Do they serve people who need it most?

While Chennai has invested crores in cleaner buses, public documents do not show if this deployment has improved mobility in high-density wards.

When Chief Minister M K Stalin flagged off Chennai's first batch of low-floor electric buses in June 2025, the programme was presented as a major step towards cleaner and more modern public transport. The first phase alone involves acquring 625 electric buses at a reported cost of ₹697 crore. The fleet includes 400 non-air-conditioned and 225 air-conditioned buses and is being operated from five depots: Vyasarpadi, Perumbakkam, Central, Tondiarpet-I and Poonamallee. The investment is substantial. Chennai has not inducted a fleet of this size in years. The buses are low-floor, wheelchair accessible and equipped with passenger information systems, CCTV cameras…

Similar Story

Riding the Chennai Metro is a breeze, but last-mile connectivity remains a worry

Chennai needs a unified transit system to ensure seamless travel for metro commuters on either side of the journey.

Stepping off the Thirumangalam metro at 6.45 pm, the train ride seemed effortless. It was cool, fast, and on time, taking just fifteen minutes from the office. Now comes the hard part. Standing at the station exit, finding a ride home is a struggle, as I switch between three apps to book an auto. The metro feeder bus only runs every 40 minutes and has just left. By the time I reach home, the "fast" metro trip has cost an extra half-hour and ₹120 in surge-priced rides, a last-mile problem the metro itself was built to solve. This is the…