Parking fees plan: what more can we do?

BBMP’s proposal to begin charging people to park on the streets can seem like a long-overdue scheme. But while the principle of charging for public space seems reasonable, we should do more than that. We should set targets for what we hope to achieve by charging parking fees.

One direct result will be revenues to the BBMP. Each of the 85 streets on which parking charges will be introduced should produce several lakhs in income to the municipal corporation each month. But are there other results we wish to see? And if yes, can we connect those results too to the scheme that is about to be introduced?

I would like to see four or five things.

(a) Enforcement needs to be stronger. Even today, with proper enforcement of our ‘no parking’ signs, we could dissuade people from using their private vehicles for many trips, and choose public transport instead, or walk their shorter trips. I assume that in the areas where on-street parking will be priced, there will be enforcement too (the tender talks about tow trucks as part of the package). But the focus on enforcement has to be wider, not just on these roads. We should not give up on that goal by introducing a small part of it on a few roads alone.

(b) In many areas, it is not unpaid parking which is the problem, and we should be willing to ban parking altogether. Merely putting a price on parking doesn’t free up road space to more users; it merely allocates it to those who have the capacity to pay. To truly enable a shift to other modes, we have to reduce the availability of parking. This is what all major cities in the world have done. A strategy of increasing parking availability and charging for it has not worked in most places.

(c) The alternatives to the use of private vehicles should be much stronger. We need 6500 more buses in the city, and the program to make footpaths walkable, which is currently being planned for only 55 roads, should be extended to 1500 roads, with at least a few in every ward being included. An entire network of walkable streets should emerge from the program.

(d) Money collected from parking meters should be ploughed into improving public transport and pedestrian facilities. That way, we’ll create a natural link between the costs of using private vehicles and the funds needed to create alternatives to them.

(e) Parking should be thought about in zones or localities, and not merely streets. A cluster of streets together should constitute a zone for parking, and enforcement should be thought about in an integrated way across the zone. The selection of parking spots, and the rights of local residents should be factored in, and a ‘local neighbourhood parking permit scheme’ created to ensure balance between those who live locally and those who visit. Such a program could be administered through the ward committees, with contractors selected by the BBMP.

In the final analysis, the move to price parking is a nudge to think about public spaces more strongly, but alongside getting started we should also be careful to begin moving in the right direction.

 
 
 

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Fishers of Thiruvanmaiyur Kuppam: Aborigines of the coast, not ‘Beach Grabbers’

Fishers of Thiruvanmaiyur Kuppam challenge claims of encroachment, defending their long-standing rights amid coastal development.

The dispute between the fishermen and the more affluent, non-fishing residents of Thiruvanmaiyur and Besant Nagar has simmered for years, highlighting tensions over land use, development, and livelihoods. Acting upon the complaint from the residents (non-fishers) in the locality, the GCC demolished the temporary constructions made by the fishers of Thiruvanmaiyur Kuppam in June this year. Being less than 40 metres from the coastline, they were termed encroachments. A mainstream news outlet even referred to fishers' construction as ‘beach robbery,’ emphasising concerns that the illegal construction of houses and pathways could lead to the loss of turtle nesting sites and…

Similar Story

Bellandur Lake rejuvenation: An urgent call for action

Citizens have strongly disapproved the slow progress on Bellandur Lake's rejuvenation project. Immediate intervention is needed to avoid failure.

Bellandur Lake, Bengaluru’s largest water body, has been at the heart of an ambitious rejuvenation project since 2020. However, persistent delays, severe funding shortages, and inadequate planning have left citizens increasingly frustrated. Time is slipping away, and without immediate government intervention, this critical environmental project risks failing. A recent meeting with government bodies shed light on the project’s stagnation and the urgent steps required to salvage it. Progress so far Desilting Work: Of the estimated 32.33 lakh cubic meters of silt, 22.69 lakh cubic meters (70%) have been removed, leaving 30% unfinished Early monsoons and slushy conditions have delayed progress…