When BBMP said the streetlight problem is ‘resolved’

Several months ago I wrote about my attempts to get a streetlight fixed on the `model street’ of 15th Cross Malleshwaram. First some `jugaad’ work had been done by BBMP. When I complained – nothing happened. Then providence intervened in the form of a truck backing up and breaking the light – resulting in the light – still functional – leaning precariously against a fence, possibly electrifying it. An urgent complaint to the MLA’s office as well as BBMP got the job done – they removed the streetlight – and with it, the jugaad job.

Picture on August 26th 2015

They assured me that it would be replaced ‘in a few days’. Since the few days turned in to months, I decided to raise a complaint once again on ‘BBMP Sahaya’. Within a few minutes I got an SMS saying that the complaint has been RECEIVED. A few days later I got another SMS saying it has be ‘ASSIGNED’ to Mr Anand, the BBMP engineer in my ward. Then ESCALATED…. a couple of days later. Then a new SMS saying it has moved to ‘IN PROGRESS’.

Text Messages from BBMP

I was starting to get excited – it looked like they were really on the job! Then, sadly, back to ASSIGNED, then again, IN PROGRESS! Finally, early this morning I got an SMS saying it was RESOLVED and finally CLOSED! A Good Governance Day Miracle! I jumped out of bed and went to check….

Picture on December 25th 2015

 At this point I dont know whether to laugh or cry.

Related Articles

The Malleshwaram streetlight problem that BBMP couldn’t solve
The saga of the Malleshwaram street light continues…

Comments:

  1. Anantha ramaiahbn says:

    I complained to 22660000 on 22-12-2015 about street light not working. Still my problem has to be attended to,

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Mapping Bengaluru’s stormwater drains: A citizen’s audit guide

Citizen-led audits of Bengaluru’s stormwater drains aim to expose accountability gaps and reclaim these neglected lifelines as public commons.

Stormwater drains are not just “invisible infrastructure.” They are the frontline of Bengaluru’s water security. When they fail, lakes die, groundwater gets poisoned, and neighbourhoods flood. Understanding this system is the first step toward reclaiming it, because without citizen awareness, the crisis remains hidden beneath our feet. In an earlier article, we explored how stormwater drains are the frontline of Bengaluru’s water security. Part 2 of the series shows how citizens can take action themselves by learning the typology of drains and conducting audits using simple tools. Accountability gaps in Bengaluru’s stormwater worksOver the years, Bengaluru’s SWD network has been…

Similar Story

Explained: Bengaluru’s stormwater drain system and the city’s water story

Bengaluru’s stormwater drains, hidden yet vital, channel rain across valleys—when neglected, they fuel floods, sewage leaks, and lake death.

Every summer, Bengaluru’s water crisis makes headlines; tanker prices soar, lakes dry up, and citizens protest encroachments, fish kills, and sewage inflows. While lakes and tanks often dominate the conversation, there’s another hidden system that quietly shapes the city’s water story: stormwater drains (SWDs). These drains are more than just channels; they are the veins of a valley city. Bengaluru sits on a central ridgeline that naturally divides its water flow into two directions: Eastward: draining into the Dakshina Pinakini (Ponnaiyar) River. Westward: draining into the Cauvery Basin via the Vrishabhavathi River. Ironically, what citizens often see as footpaths or…