A broken lamp post, MLA’s office and other issues!

A couple of months ago I wrote a couple of articles on my struggle to get a lamppost repaired on the street where I live. The issue was not that the light was faulty—but 15th Cross Malleshwaram is supposed to be a ‘model road’ where the utilities are buried under the footpath. However, a BBMP repairman who had come to repair a streetlight next to it had just connected a wire from the lamppost to the streetlight about 10 feet above the ground. I requested him to do a proper job but he did not heed to my request. Apart from being unaesthetic, it was also a little dangerous. And in any case the street light did not work (and in fact, still does not!)

A lamp post dangling dangerously on the nearby compound. Pic: Ramesh Sreekantan

So I wrote to several agencies to get the work done properly. BBMP created several complaint numbers and called me several times asking me if the work was done. No work was ever done. At some point some repairman came, asked me what the problem was (clearly a hanging wire does not present a problem in his book!).

However, providence came to my rescue. A couple of weeks ago a careless truck driver reversed in to the lamp post and bent it to the point that it was touching the fence of my house. As I was concerned that it could be a potential electrical hazard, I contacted BBMP again—by sending emails to various agencies and sharing it on a Malleshwaram ‘What’s App’ group. I also sent and email to out local MLA, Dr. C N Ashwath Narayan.

Broken lamp post. Pic: Ramesh Sreekantan

It seems like that did the trick! The next day the folks from BBMP came and removed most of the lamppost. While doing that they also disconnected the offending wire! So at least at the moment the problem has been ‘solved’. Except that now all that remains of the lamppost is a stump.

I’ve been assured by the BBMP and MLA’s office that the lamppost will be replaced. As of now, about 10 days after the incident, there is no sign of that.

Lamp post stump. Pic: Ramesh Sreekantan

This goes to show how broken the system is. With great fanfare, BBMP announced the BBMP Sahaya website and Malleshwaram Sahaya website. However, apart from causing the hapless call centre employees to have to bear the brunt of the curses of  irate citizens, this seems to have no effect. The only thing that seems to work, at least in Malleshwaram, is to email the MLA. One would think that his office would have better things to do than having to deal with non-functional lampposts on the occasional street, but apparently there is no other way to get such problems addressed.

Related Articles

The saga of the Malleshwaram street light continues…
Malleshwaram, the grand old lady of Bangalore!
The Malleshwaram streetlight problem that BBMP couldn’t solve

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Bengaluru is building ward-level climate action plans: Here is how

The Climate Action Cell will develop ward action plans for ten wards in five city corporations of Bengaluru. These will be replicated in other wards.

In Varthur, east Bengaluru, residents watch in dismay as leachate from garbage trucks seeps into the Varthur Lake. “We need a local composting or bio-methanisation plant right here in the ward,” insists Jagdish Reddy, a resident. He points out that irregular waste collection and burning of leaf litter are not just polluting water bodies but also affecting air quality. Across the city, the problems are varied, but the frustration is the same. In HSR Layout’s 5th sector, open drains reek, and roads flood with the slightest rain, says Jyothi G Prabhu. Meanwhile, Gunjur resident Chetan Gopal points out that the…

Similar Story

Confusing forms, tight deadlines: Inside the flawed SIR process

Enumeration deadline extended to Dec 11th; as Chennai voters and BLOs race to wrap up, we give you a lowdown on the process.

In Chennai’s Perumbakkam resettlement site, residents working as domestic workers leave home at 9 am and return only after 6 pm. For them, the Election Commission of India’s (ECI) Special Intensive Revision (SIR) seems almost impossible to navigate. A community worker from the area observes that in earlier voter roll verifications, households received a simple part-number booklet. Now, Booth Level Officers (BLOs) set up camps instead of going door-to-door, asking residents to collect the forms themselves. The new form asks for additional details such as parents’ voter IDs, which many residents do not know, she adds. With low literacy levels,…