Yelahanka lakes review by Upa Lokayukta

True to his promise, the Upa Lokayukta Justice SB Majage visited Yelahanka’s Allalasandra Lake and Puttenahalli Lake on 30th March 2014. As reported earlier, a follow-up of his February inspection was due in the first week of April, but he made it before time.

Local groups have been earnestly following up with LDA / Forest Department and BWSSB to resolve the problems faced by the two lakes:  
– water quality degradation due to continuous inflow of sewage, through storm water drains, broken sewage chambers and a dysfunctional STP
– foul smell
– mosquito nuisance
– contamination of water in neighbourhood wells and borewells.

While Yelahanka Puttenahalli Lake and Bird Conservation Trust (YPLBCT) and Vinayaka Residents Welfare Association (VRWA) are working for Puttenahalli Lake, Yelahanka United Environment Association (YUVA) is working for Allalasandra Lake and also helping with Puttenahalli Lake. 

At Allalasandra, office bearers of YUVA Dr SP Tayappa, Mr Chandru, Mr Narayan and other members, escorted the Upa Lokayukta around the lake. BWSSB officials including Chief Engineer Mr T Venkatraju, Additional Engineer Mr SP Rudramurthy, Yelahanka Sub-divisional engineers and LDA CEO Mr Shivanna were also present and they were shown the various sewage entry points. At the last inspection BWSSB had set itself dates in February to stop the sewage at the two lakes, but it did not meet these deadlines.

Upa Lokayukta Justice SP Majage (in brown coat) during his inspection of two lakes in Yelahanka (March 30, 2014) 

After discussions between the Upa Lokyukta, residents, BWSSB and LDA, the following action points were listed: 

Allalasandra Lake

– BWSSB would call for tenders for the sewage pipe line works after the Lok Sabha elections on 17th April 2014.
– Works to stop sewage entering the lake from the broken sewage chambers would be complete by 30th May 2014.
– A mini STP plant would be commissioned within a year (confirmed by BWSSB Chief Engineer).
– The horticulture department would complete the ongoing development works at the lake within the next two months. 

Puttenahalli Lake

– The Detailed Project Report (DPR) would be completed within 2 months (confirmed by LDA CEO).
– Sewage stoppage works would be taken up by BWSSB after the DPR is ready.
– The revival of the non-functioning STP would be started by BWSSB shortly, which would provide treated water to the lake.

With YUVA, YPLBCT and VRWA keeping the pressure on, it is hoped that by the time the next review happens (in a couple of months), some of the action points will have seen reasonable progress towards completion.

Information received from: Mr Jagadeesh Giri (from YUVA) and Commander CR Babu (from YPLBCT)   
Pics: Mr Jagadeesh Giri (from YUVA)

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Why Uppal is getting hotter: Dense construction and reduced green cover increase temperatures

Data from 2015-2025 reveals how rapid urbanisation has intensified Uppal's heat risks, signaling the urgent need for blue-green infrastructure in Hyderabad.

Uppal is a suburb of Hyderabad, located in the northeastern part of the city. It is known for housing landmarks like the Rajiv Gandhi International Cricket Stadium and has schools, government offices, industrial zones and commercial centres. The area experiences high temperatures due to the Urban Heat Island (UHI) effect that operates within the city limits.  Our examination of Land Surface Temperature (LST) data covered the years 2015, 2020, and 2025 and shows how heat zones have expanded with warmer areas becoming larger. In Uppal, rapid urban development has changed the thermal balance. Dense construction and fewer trees  are creating  persistent…

Similar Story

BDA’s tree plantation drive faces accountability issues, not accounting errors

This record-breaking drive in Bengaluru has cleared out shrub ecosystems rich in biodiversity to plant saplings that may never thrive.

Fifteen lakh trees. A place in the Guinness Book of Records. The Bengaluru Development Authority (BDA) has been on overdrive, promoting its new project to plant 15 lakh trees in spaces created in its new layouts. 240 acres have been earmarked across BDA’s faraway layouts. The saplings are to be planted across lake and nala buffer zones, parks and public spaces in new neighbourhoods like Nadaprabhu Kempegowda Layout, Banashankari 6th Stage, and Dr Shivarama Karanth Layout, according to the BDA Chairman N A Haris. While such massive tree plantation exercises are by themselves questionable, there is also the question of a…