Mayor met Citizens through Abhyudaya

Mayor D Venkatesh Murthy met the residents of Padmanabha Nagar, listened to their grievances and assured them a solution.

Residents Welfare Association of Padmanabha Nagar, under the aegis of Abhyudaya, arranged a platform for citizens to interact with Mayor  D Venkatesh Murthy and Deputy Mayor L Sreenivas at Carmel School, Banashankari, on June 2.

Mayor D Venkatesh Murthy and Deputy mayor L Sreenivas, with residents of Padmanabha Nagar. Pic: Sankar C G

BBMP corporators H Suresh (Kumaraswamy Layout), A H Basavaraju (Banashankari Temple ward), V R Sharma- President Abhyudaya, N S Mukunda- Secretary Abhyudaya, V V Ramakrishna-Joint Secretary Abhyudaya and activist N S Ramakantha were also present.

Abhyudaya wanted to congratulate the Mayor and the Deputy Mayor on being elected and also air their grievances.

Citizens complained about over flowing drainages, rain water harvesting, solid waste management problems and pavement encroachment by vendors in their area. N S Mukunda secretary of Abhyudaya spoke about various unused tax sources.

After hearing citizens’ grievances Mayor assured them a solution very shortly. “In a meeting that was held at BBMP head office, we have instructed the engineers to find a permanent solution for SWM, drainage and sewage problem and pot holes in the roads in 37 days,” said Mayor.⊕

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

How Chennai’s Third Master Plan can tackle climate risks

As the city faces extreme weather, a study calls for ward-level action, improved climate adaptation and inclusive planning.

Over the past two decades, Chennai has weathered a tsunami, repeated floods, and now, according to a new study, a rapidly worsening mix of heat and rain. Heatwave-preconditioned extreme rainfall events in the Chennai Metropolitan Area have nearly tripled over four decades, rising from an average of 1.2 events a year between 1982 and 1991 to 3.2 events a year between 2012 and 2021. When a heatwave comes before the rain, the same study finds, the population exposed to flooding rises elevenfold and the number of buildings affected rises seven-fold. A separate assessment projects that heatwave days in the city…

Similar Story

PG collapse in Delhi’s Satya Niketan: Who is responsible?

A DU PG collapse exposes the gap between Delhi's planning rules and real building safety. Watch this video to know more.

On September 6, a five-storey boys' Paying Guest (PG) accommodation collapsed in Satya Niketan, near Delhi University's South Campus, leaving seven people dead. This video looks beyond the single building to ask how the neighbourhood reached this point. Delhi has had a formal planning system since the DDA was set up in 1957 and the first Master Plan followed in 1962. Yet Satya Niketan has grown into a dense student housing hub. Officials say the collapsed building had permission for only the ground plus first floors. Ayush Anilal, an architect, studied the area for his thesis. He explains how intensely…