Look at the past …

On a mailing list for cyclists, that I belong to, I received this analysis,from Chidambaran Subramanianb, of why road-widening is not a sustainable option:

"Cut down the trees, widen the roads , make them signal free if possible. Good, I am pretty sure that there will be no congestion for a week. Then, with the added cars everyday in the city and the new cars that are coming/going to come, there will be congestion and much more pollution than before. Now people will take another road which is pleasant and tree-laden. Identify that as an arterial road , widen it and hopefully to shut up the stupid cycling community , give a cycling lane. Whether a cycling lane will result in only cycles is something to be seen( I am for shutting off stretches of roads for vehicles but that is off-topic) . Now again, to free up the congestion, we’ll start doing an underpass in an important junction, hopefully widen a residential locality , and try pushing off the pesky residents there by trying something smart like a TDR. Once we exhaust that, we go back to the original road that we widened, decide that its not wide enough, build an aerial expressway which is signal free. After some time that gets congested. Then what?

"Maybe I am a bit shortsighted but I’d really appreciate if someone can enlighten me as to how this scheme is sustainable. And regarding the timelines of the new roads getting congested, I’m not kidding. Look at Palace road,Shesadri road Nrupatunga Road. Does anybody have any figures for the traffic flow before widening and a month after widening , and a comparison of before the widening and now.

"I am a big fan of building highways and making traffic between cities fast and transport cheap. But the cities and villages are basically meant for the people to live and work, and they should be designed accordingly. Not opt for a quickie and repent in leisure."

****************

We don’t have to paint a scenario for the future. Let’s look at the recent past.

I have personally lived, and suffered, through road-widening and three flyovers. The first and second….the Dairy Circle Flyover, and the one near my home (where we lost about 30 trees) the Jayadeva Flyover, which was opened on July 31, 2006:

http://deponti.livejournal.com/96113.html

 

Within 4.5 years, Bannerghatta Road is as choked as ever. At the third one, at Silk Board, they resorted to an elevated road.

Now, at the site of these 3 flyovers, we have roads that can be widened no more…no trees…very narrow or non-existent pavements….and jammed traffic.

"Those who cannot learn from the mistakes of the past are condemned to repeat them in the future".

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Similar Story

Chennai’s ₹697 crore electric buses: Do they serve people who need it most?

While Chennai has invested crores in cleaner buses, public documents do not show if this deployment has improved mobility in high-density wards.

When Chief Minister M K Stalin flagged off Chennai's first batch of low-floor electric buses in June 2025, the programme was presented as a major step towards cleaner and more modern public transport. The first phase alone involves acquring 625 electric buses at a reported cost of ₹697 crore. The fleet includes 400 non-air-conditioned and 225 air-conditioned buses and is being operated from five depots: Vyasarpadi, Perumbakkam, Central, Tondiarpet-I and Poonamallee. The investment is substantial. Chennai has not inducted a fleet of this size in years. The buses are low-floor, wheelchair accessible and equipped with passenger information systems, CCTV cameras…

Similar Story

Riding the Chennai Metro is a breeze, but last-mile connectivity remains a worry

Chennai needs a unified transit system to ensure seamless travel for metro commuters on either side of the journey.

Stepping off the Thirumangalam metro at 6.45 pm, the train ride seemed effortless. It was cool, fast, and on time, taking just fifteen minutes from the office. Now comes the hard part. Standing at the station exit, finding a ride home is a struggle, as I switch between three apps to book an auto. The metro feeder bus only runs every 40 minutes and has just left. By the time I reach home, the "fast" metro trip has cost an extra half-hour and ₹120 in surge-priced rides, a last-mile problem the metro itself was built to solve. This is the…