GENRE: Voices

BBMP wants to take land from the owners along the 100 feet ring road (BTM Layout and JP Nagar) for road widening. They say they are doing this "for the benefit of the larger population". Now compare this with Bangalore Metro train project. The government setup a committee  called "Thomas Committee" which analysed the socio-economic impact and set the guidelines for deciding the compensation package for each of the affected land owners and business establishments. The report can be seen at the following link here. Now the Metro is also being built in the same place and the irony is…

Read more

The construction of a residential house in 121, 3rd cross, Dollars Layout, JP Nagar 4th phase has been going on for more than past four years. This design-as-you-go house is less than 50 per cent complete at this time. The construction is done with steel and concrete. This type of construction requires very good planning as there is very little room for error. Once the concrete is poured the structure is fixed and can’t be altered. This building is anything but planned. One day they build a section of the building and following week they realise they made a mistake.…

Read more

One might wonder as to what is so unusual for a person to use a wheelchair at any airport; often these are people who are sick, old or unable to walk due to fractures or disability. For me it was scary, challenging and full of apprehension. That’s because I have been a patient of Parkinson disease for the last ten to twelve years.Parkinson’s disease is a neurological disorder caused by degeneration of brain cells and is a progressive disease which leads to chronic disabilities of movements such as  slowness, tremors, drooping rigidity called Bradyskinesia and Dyskinesia which cause involuntary movements…

Read more

There is complete chaos with the markings that BBMP has made on the properties on 100 ft Ring Road in JP Nagar, where they say they will now acquire part of our property to widen an already wide road.1. Minutes of a CDP (Comprehensive Development Plan 2015) meeting classifies this as a medium density road, why would the BBMP need more than a 100 ft road for a medium density road.2. The Peripheral Ring Road is getting ready, should they not divert all heavy vehicles to that road which would then mean there would be no need for road widening.3. These…

Read more

On 9 August, M  Karunanidhi, the Chief Minister (CM) of Tamil Nadu, unveiled the statue of Thiruvalluvar near Ulsoor Lake. Kalaignar, as he is popularly known, was at the RBANMS grounds when the statue was unveiled by remote control.  The yellow curtains opened and suddenly, magically the statue became visible to people from all four directions. There was a hush and it took a while for people to start clapping.It was past 12:20 PM.  Kalaignar’s speech broadcasted over loudspeakers, talked of the need to build interstate brotherhood which was lavishly quoted from Sarvagna’s couplets.  He said publishing Kannada poet’s couplets…

Read more

This juction is at Chikkallasandra and is situated on Uttarahalli road, 18th main (Komarla Feeds road) and Chikkallasandra main road in front of the Sani Mahathma Temple. It  is extremely chaotic and the road users have absolutely no civic sense. The traffic flow is very heavy at all times and there is no police post to regulate. All types of vehicles are parked near the junction flouting basic rules and adding to the chaotic situation. The roads are also not broad enough for vehicles to move . There are three hairpin bends at the junction which do not allow view…

Read more

Last week, I walking towards JP Nagar 4th phase and I realised that the footpaths were dangerously uneven. I am a student preparing for my competitive exams. I am constantly studying and hence retaining information and staying fit is of primary importance. I was being extra cautious and tried not to slip off any stone slab. As I am thinking about how smart and careful I was, my head collides against a branch of a tree (so much for being careful!!). I would not blame it on my height as I am of average build. It took me a while to recover from the jolt and…

Read more

We all crib about civic services, about crazy traffic, unscheduled power cuts, and a dozen other things which characterise life in namma Bengaluru . How about some humour and diversion for a change, trying to look at the same issues from another angle, to keep our blood pressure under control?Traffic snarls, for one. Yes, it is maddening when one is stuck in endless jams at each signal, and it takes two hours to cover 15 kilometres. How about playing a game with yourself while you wait – try to guess how many vehicles will jump the signal before it turns…

Read more

The other day, a friend from Hasiru Usiru got news that some trees were being felled at a construction site near the Indian Express building. A few people including me went to investigate and see if we could do anything about it.  It didn't take us very long to discover the site. When this group reached the spot, we discovered that trees had not been felled as yet, but branches of one tree had been pruned and pruned rather extensively. On asking the contractors if they intended to cut the trees which were in the vicinity, they said that they…

Read more

The BDA is in the process of building two flyovers on the Outer Ring road near the Iblur and Agara junctions in south-east Bengaluru as part of their 'signal free' Outer Ring Road project.  This article presents some questions, comments and suggestions regarding both the grade separators, on the basis of the project plans obtained from the Bangalore Development Authority (BDA) in response to an RTI request by Citizen Matters. The flyovers have been described in an earlier article in Citizen Matters.  Two dedicated, access controlled, 11.5 feet wide bus lanes on either side of the central median of the…

Read more
39960