





Refer to my earlier post relating to the roads being resurfaced without proper milling: In continuation to what I had said in the above post, I would like to record the recent developments which could be of public interest. On the 15th of May 2019 I happened to pass through Kannabiran Koil Street ( North end of lane where Ayyappan Koil is located) and noticed some workers cleaning the surface of the road. I was wondering if the Roads were being swept clean by the Conservancy Sweepers Gang or if it was being prepared for resurfacing. Later in the evening…
This is in continuation to my previous blog post. A median made up of concrete blocks was originally installed between the Venkatraman Canal Street - Perambur High Road intersection to the Perambur High Road - Madhavaram High Road intersection. This median existed until 2015 elections before it was removed, further details relating to this matter can be found in the link above. After repeated follow ups with the AE BRR, AC Traffic and the Zonal Office, a temporary median made of concrete blocks and metal barricades was set up for a small length on the road in front of the…